Top-rated driveway sealcoating pros.

Get matched with top driveway sealcoating pros in Sharon, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your driveway sealcoating project in Sharon, MS?

Select your specific project to find the pro for you.

Find Driveway sealcoating pros in Sharon

Avatar for Unparalleled Striping
Unparalleled Striping
New to Angi
Asphalt SealingAsphalt Sealing- For Business

Serving Sharon, MS and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

We are a locally owned and operated company that values honesty and integrity and treats your home and business as if it were our own. We offer a variety of General Contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!\n

Morrison Food
Morrison Food
Morrison Food
Morrison Food
Morrison Food

+5

Driveway Sealcoating questions, answered by experts

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

A properly applied asphalt driveway sealer, or sealcoat, should last between one and five years. The industry standard is to reseal every two to three years for optimal protection. If you live in a climate with extreme weather, such as heavy rainfall or freezing temperatures, you may need to reseal your driveway more frequently, around every two years. Signs that your driveway needs a new coat of sealant include the appearance of small cracks or uneven drying after rain.

Sealing your driveway gives it the longest possible lifespan. You’ll reduce your driveway’s risk of cracking, breaking down from exposure to UV light, discoloring, and staining from road chemicals.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

The Sharon, MS homeowners’ guide to driveway sealcoating

From average costs to expert advice, get all the answers you need to get your job done.