Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Macon, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Macon, MS?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Macon

Avatar for Birds Land Services
Birds Land Services
5.0(
12
)
Gravel or Loose Fill Paving - Install, Spread or ScrapeGravel or Loose Fill Paving - Install, Spread or Scrape - For Business

Serving Macon, MS and surrounding areas

In business since 2024

Free estimates

Emergency services offered

"I had them clear a few acres of raw land. Tree service was closest fit. They came w nice equipment for doing the job and the young man worked tirelessly all day. Cleared and flattened a couple of acres and cut driveways. It was fun to watch the mulcher chew thru the scrub and brambles. Nice folks. Iâ ll be calling them again for more work soon. Highly recommend them!!"
Bush/stumps to remove
5 Bushes and stumps removed.
Response time3 hrs
Response rate87%
Recommended by60%of homeowners
RR Construction and Concrete
5.0(
1
)
Concrete Driveways - Install

Serving Macon, MS and surrounding areas

In business since 1996

Free estimates

We take great pride in our experience, expertise, quality and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety and quality, regardless of how large, or small, the job.

Response time2 days
Response rate85%
Recommended by100%of homeowners
Avatar for Concrete Plus, LLC
Concrete Plus, LLC
5.0(
2
)
Concrete Driveways - Install

Serving Macon, MS and surrounding areas

In business since 2024

Free estimates

Warranties offered

"These guys showed up when they said they would. Went above what they said they would to. Helped consultant me on my options. They take pride in their work, and get the job done."
Back Patio
Sidewalks
Basement Floor
Response time2 days
Recommended by50%of homeowners
Avatar for Overstreet Construction&roofi.g.l.l.c
Overstreet Construction&roofi.g.l.l.c
4.0(
5
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - InstallGate for Driveway or Security - Install or Replace

Serving Macon, MS and surrounding areas

In business since 1969

Free estimates

Emergency services offered

"

Job was done on the date promised, in the time span estimated and at the price quoted. The two man team properly braced the porch roof before tearing the old column out. They built the new column on site. The team removed all tear down debris as well as the trash from the construction phase (a really big plus in my book since I have had other contractors leave their trash for me to clean up.) The contractor asked for a deposit before they began and the balance after the work was completed. I marked them down on punctuality since they told me that they would be here at 9:00 but it was 90 minutes later before they arrived and another 30 minutes before they started work. As I said above, the work completion was promised for the end of the day and they met that.


"
Additional Photos
Recommended by80%of homeowners
Showing 1-10 of 42
Asphalt Driveways questions, answered by experts

Professionals restore the surface to a fresh, attractive finish by applying a new, even sealant layer.

Yes, it is possible to pave over an existing driveway, but whether it's the right choice depends on several factors. If the underlying structure of your current driveway is still strong, concrete or asphalt resurfacing can be a cost-effective way to prolong its life. However, if your driveway has significant issues like potholes, deep cracks, or other inconsistencies, it is best to remove the old driveway and start from scratch. Key factors to consider include the current driveway's condition, the compatibility of the new material, the added thickness and height, and the necessary surface preparation.

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

The Macon, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.