Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Starkville, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Starkville, MS?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Starkville

Silver Leaf Construction, LLC
New to Angi
Asphalt Paving - Install

Serving Starkville, MS and surrounding areas

Approved

In business since 2006

Free estimates

Credit card accepted

Silver Leaf Construction is able to handle various industrial and residential construction projects. With over 25 years of experience, we can handle basically any outdoor job. We can clear, clean it up, excavate it, smooth it, build it and maintain it. By exceeding expectations and earning your trust, Silver Leaf Construction is committed to establishing long term client relationships. Hopefully, client satisfaction will be attained by our integrity, performance and job value. Call us today!

Avatar for Concrete Plus, LLC
Concrete Plus, LLC
5.0(
2
)
Concrete Driveways - Install

Serving Starkville, MS and surrounding areas

In business since 2024

Free estimates

Warranties offered

"These guys showed up when they said they would. Went above what they said they would to. Helped consultant me on my options. They take pride in their work, and get the job done."
Back Patio
Sidewalks
Basement Floor
Response time2 days
Recommended by50%of homeowners
...
Showing 1-10 of 55
Asphalt Driveways questions, answered by experts

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Chip seal layers gravel and a liquid bitumen one at a time on-site, while asphalt directly pours a pre-combined mixture. Asphalt must be sealed, but it will last up to four times as long as chip seal driveways. Aesthetically, chip seal has a natural, rustic look compared to the traditional asphalt slab.

By grading and compacting the base soil, ensuring proper drainage and stability.

The Starkville, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.