Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Meridian, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Meridian, MS?

Select your specific project to find the pro for you.

TRUSTED BY MERIDIAN, MS HOMEOWNERS

  • Average homeowner rating star icon3.5
    Average homeowner rating
  • Verified reviews icon17
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in Meridian

Avatar for Reiker Land Services
Reiker Land Services
4.9(
7
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Meridian, MS and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"Reiker Land Services is upstanding in their customer service. Honesty at its’ best! Fair quotes! Reliable business and quality service. You cannot go wrong when you hire Reiker Land Services to do your small or large job! Highly recommend!"
4 neighbors recently requested a quote
Avatar for Unparalleled Striping
Unparalleled Striping
New to Angi
Asphalt Sealing

Serving Meridian, MS and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

We are a locally owned and operated company that values honesty and integrity and treats your home and business as if it were our own. We offer a variety of General Contractor services that are customizable to each individual project. You will find us to be competitively priced, paying close attention to the details of each and every project that we are involved with. We look forward to building lasting relationships and guarantee your satisfaction!\n

Morrison Food
Morrison Food
Morrison Food
Morrison Food
Morrison Food

+5

Avatar for Carr Contracting
Carr Contracting
5.0(
8
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - Install

Serving Meridian, MS and surrounding areas

"I needed a slab for my patio. Zach and his crew came out and completed in a timely manner. They were very professional and the slab looks great. Would definitely use them again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Response time6 hrs
Recommended by100%of homeowners
...
Showing 1-10 of 66
Asphalt Driveways questions, answered by experts

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

To ensure you hire a reliable and experienced paving company, you should start by finding companies in your area that have at least five to ten years of experience working in your neighborhood. Next, rule out companies with poor reviews online or a series of complaints filed with the Better Business Bureau. Since driveways affect your curb appeal, you should also ask each company for references and pictures of recent work to make sure the work the company does is professional and high quality. Finally, check that the company is licensed and insured.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

You should contact your driveway installer before winterizing a newly installed driveway. Winterizing it before the asphalt or concrete has fully cured can damage the driveway. But in many cases, you don't need to winterize a newly installed driveway anyway since it's likely freshly sealed and won't have much damage yet. 

The Meridian, MS homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.