Top-rated solar panel pros.

Get matched with top solar panel pros in Byram, MS

Enter your zip and get matched with up to 5 pros

Need a pro for your solar panel service project in Byram, MS?

Select your specific project to find the pro for you.

Find Solar panel pros in Byram

Avatar for ADT Solar
ADT Solar
4.4(
111
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Byram, MS and surrounding areas

In business since 2008

Free estimates

Warranties offered

"Rep. checked entire system. He found several wires not connected properly and fixed this. He also made recommendations regarding the attachment of the panels to the rood that would provide more stability and leakproofing. The representative appeared to know what he was doing - much better than others, including the representative who was engaged by the roofer (who replaced our rood due to hail damage) to disconnect/connect the panels."
11 kW PV Installation
5 kW PV Installation
9.5 kW PV Installation
Recommended by89%of homeowners
Avatar for Dish Network Retailer Satellite Country
Dish Network Retailer Satellite Country
4.0(
283
)
Solar Panel InstallSolar Panels For Electric System - Install - For BusinessSolar Panels For Electric System - Repair+1 more

Serving Byram, MS and surrounding areas

In business since 1990

Free estimates

Credit card accepted

"I was very impressed with the installer who was sent. He mounted the dish without drilling through my new roof, which might have voided my roof warranty, Also, he mounted the dish in a location where it is easy for me to brush the snow off it in winter. I appreciate his knowledge and thoughtfulness. Also, they didn't charge me to re-install the dish."
Dish Options
Recommended by74%of homeowners
Avatar for Roeder's Plumbing
Roeder's Plumbing
5.0(
12
)
Solar Water Heater System - InstallSolar Water Heater System - Install - For BusinessSolar Water Heater System - Repair+1 more

Serving Byram, MS and surrounding areas

In business since 2000

Emergency services offered

"I received a call right away from Roeder's Plumbing and a service call was arranged that fit my schedule. The plumber was professional and friendly. He was very knowledgeable and experienced. He diagnosed the problem right away and made all three repairs in a timely manner. He had the parts on his truck to make all the repairs which was wonderful because we didn't have to wait for parts and reschedule another visit. It's been a month since our service call and everything is working well. I will definitely call them again. Great service."
Recommended by100%of homeowners
Showing 1-10 of 21
Solar Panels questions, answered by experts

No, you cannot turn on a new solar system before inspection. The inspector checks that the system is correctly connected to the grid and that safety components and features are in place. This process prevents problems on the electrical grid and offers protection against fire in your home. 

Your local utility company may also require inspection documentation before you can connect to the grid. An inspection can ensure solar power efficiency and determine how you might increase it.

On average, a typical fridge uses 115 kWh per month. With eight hours of sunlight per day, a 100-watt solar panel can produce 30 kWh per month. This means you’ll need at least four dedicated panels to power the refrigerator with solar energy. Consult with a solar power specialist to get a more accurate estimate.

The best way to save money on solar panels is to take advantage of federal and state solar incentives. For example, the solar investment tax credit (ITC) offered by the federal government can save 30% of your total—if you can take the entire credit, which is based on income taxes owed—or an average of around $9,000. You can check the Database of State Incentives for Renewables and Efficiency (DSIRE) for state and local incentives that could save you even more.

The time it takes to install solar panels depends on the number of panels and the size of your home, but installation takes between two and three days of work. While most contractors can install the panels over the course of a couple of days, switching to solar energy can take two to three months in total. This includes the time it takes to design the system, procure the parts, obtain the permits, install the panels, connect to the main power grid, and get an inspection.

While you can minimally overshoot the number of solar panels you need for your home, it's not smart to go too far. Not only is the extra cost unnecessary, but your state may put caps on how much energy your home can produce and send back to the grid. It is always best to work with a solar energy professional to determine the best system size for you.

The Byram, MS homeowners’ guide to solar panel services

From average costs to expert advice, get all the answers you need to get your job done.