Get matched with top concrete mudjacking pros in Versailles, MO
Top-rated concrete mudjacking pros.

Need a pro for your concrete mudjacking project in Versailles, MO?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Versailles

Avatar for Key Concrete LLC
Key Concrete LLC
4.9(
8
)

Serving Versailles, MO and surrounding areas

Approved

In business since 2021

Free estimates

Emergency services offered

"They were great throughout the whole process. It was great to be able to use one company for machine excavation, all dirt work, footings, foundation and back filling."
Mountain Rd.
Mountain Rd.
Mountain Rd.
Mountain Rd.
Mountain Rd.

+32

Response time2 days
Response rate100%
1 neighbors recently requested a quote
Avatar for Foundation Recovery Systems
Foundation Recovery Systems
4.4(
493
)

Serving Versailles, MO and surrounding areas

Approved (Corporate)

Super Service Award Winner

In business since 1992

Free estimates

Warranties offered

"Trenton and Miguel were very friendly, punctual and did a great job raising the back concrete steps and leveling the sidewalk. Since it rained, they are coming back to do the caulking."
Protect Your Basement Before & After
Protect Your Basement
Waterproof Your Basement
Correct Your Wet Basement
Protect Your Concrete Before & After

+16

Response time1 day
135 neighbors recently requested a quote
Recommended by89%of homeowners
Avatar for Advanced Foundation Repair & Replacement
Advanced Foundation Repair & Replacement
5.0(
30
)

Serving Versailles, MO and surrounding areas

Emergency services offered

"Foundation Repair - our house had to be raised about 3 inches. Frank and his crew were very professional, kept to their schedule. Frank spent extra time with my parents to explain the scope of work and minimize the disruption to their lives. His bid was very thorough and he was upfront with the fact that there could be additional cost based upon what the crew found once they exposed the foundation wall. Would definitely use him again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by100%of homeowners
Perma-Jack Of Mid-Mo, LLC
5.0(
2
)

Serving Versailles, MO and surrounding areas

In business since 1997

Free estimates

Warranties offered

Customer satisfaction is what determines our success, which is why we take a hands-on approach. When interacting with PermaJack Of Mid-Mo, you'll notice that we're particularly focused on the principles of quality workmanship, timely completion, competitive pricing and integrity in all our business dealings. We combine knowledge and research with our extensive practical experience to ensure a specialized approach for your project needs. Contact us today for a fair and accurate estimate of your project. We look forward to adding you to our long and growing list of happy customers.

Pre Construction piers
Pre Construction piers
Pre Construction Piers
Pre Construction Piers
Pre Construction Piers

+4

Response time2 days
Response rate87%
Recommended by100%of homeowners
Showing 1-10 of 16
Concrete Mudjacking questions, answered by experts

Costs range from $500 to $1,500, depending on the size and condition of the area.

A good slump height really depends on the project, but there is a use for nearly all slump levels. For example, low slumps are best in projects that require structure, such as curbs and roads. High slumps often require additional reinforcement, but they flow more freely into hard-to-reach spaces.

Charges correlate with surface size, settlement depth, and access, often yielding significant savings over concrete replacement.

Trenching and boring are two distinct methods for installing underground utilities. Trenching involves digging a channel using equipment like an excavator, trencher, backhoe, or shovel. While it is a simpler process, it causes significant disruption to the surface, landscaping, and surrounding ecosystems.

Boring, also known as directional boring, is a less invasive alternative that uses a drill to create a tunnel for utility lines without disturbing the surface. This method is more precise and is ideal for installations that need to go underneath buildings, roads, or bodies of water. Although boring is less disruptive, it is generally more expensive than trenching.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

The Versailles, MO homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.