Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Unionville, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Unionville, MO?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Unionville

Patriot Paving, LLC
3.2(
23
)
Asphalt Paving - InstallAsphalt Paving - Install- For Business

Serving Unionville, MO and surrounding areas

In business since 2016

Free estimates

Credit card accepted

"Very professional, answering all questions. Prompt follow up with an estimate. Arrived on scheduled date and time. Produced a brand new driveway and, as a bonus, leveled out a dip at the bottom of the drive which previously collected rainwater. Went out of their way to promptly resolve a payment discrepancy. Extremely pleased with final project!"
Response time1 day
Recommended by75%of homeowners
Showing 1-10 of 31
Asphalt Driveways questions, answered by experts

If your driveway is cracked, you can repave it with a process called asphalt overlay. Overlay is more cost-effective than a full replacement but is better suited for minor cracks and issues. If you have major cracks or other problems like water pooling, asphalt overlay isn’t your best bet. Plus, paving over a cracked driveway only extends the lifetime by about 10 years, whereas replacing it would start the clock over completely to give you up to 30 years.

The answer to whether or not you need to get a permit before you start your driveway can vary widely based on local ordinances and the scope of your driveway ideas. In most urban and suburban areas, a permit is needed before building a new driveway to ensure that a homeowner is using safe materials and proper drainage practices while designing and constructing a new driveway. In some rural areas, a homeowner may not be required to apply for a permit. When building a new driveway on your own, always check with your local building department to see if you need to request a permit. When hiring a driveway contractor, verify that the right permits are being used before driveway construction begins.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

When asphalt cures, it typically changes from a very dark black hue to a lighter, more matte gray color. Cured asphalt also won’t be tacky or sticky to the touch or emit any odors from the asphalt mix. Additionally, the surface of fully cured asphalt won’t deform under any pressure.

In the United States, roads are usually categorized as one of three types: public roads, other drivable roads, and non-drivable roads. These categories dictate how a road can be used; a non-drivable road might be classified that way because it is heavily damaged and unsafe for cars.

The Unionville, MO homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.