Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Neelyville, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Neelyville, MO?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Neelyville

Longhibler & Sons
3.6(
5
)
Gate for Driveway or Security - Install or Replace

Serving Neelyville, MO and surrounding areas

In business since 2016

Free estimates

Longhibler & Sons is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade, combined with ability, is what makes us true professionals. Above all, we are watchful of our customers interests and make their concerns the basis of our business.

Response time5 days
Recommended by80%of homeowners
Showing 1-10 of 34
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Three inches is a great thickness for a residential asphalt driveway that sees minimal to moderate traffic from cars, SUVs, and pickup trucks. However, a thicker driveway can better withstand the weight of a heavier vehicle, such as a trailer or a recreational vehicle. If you drive a heavy vehicle on a thin driveway, you risk cracking and damaging it.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

Wet cutting is usually the preferred method. It controls dust, which helps protect your lungs and makes for a cleaner working environment. Plus, the water cools the blade, preventing overheating and prolonging its life while providing smoother, more precise cuts. The downside is the mess—water and asphalt sludge can be messy to clean. Dry cutting, though convenient if water isn’t available, creates a lot of dust, which can be harmful. This also increases the risk of blade damage due to overheating. So, if you have the option, wet cutting is the better method for most asphalt jobs.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

The Neelyville, MO homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.