Top-rated asphalt driveway pros.

Best asphalt driveway pros near Marionville, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Marionville, MO?

Select your specific project to find the pro for you.

Top-Rated Asphalt driveway pros in Marionville - Updated Nov 2026

Avatar for A & S Coating
A & S Coating
4.6(
34
)
Asphalt SealingAsphalt Paving - Repair or Patch

Serving Marionville, MO and surrounding areas

Approved

In business since 2003

Free estimates

Emergency services offered

"Alfred completed our sealing our long 250+ ft driveway in less than a day and work looks great. Sealed the cracks with rubber, too. No change from the estimate to the final bill, work completed on time."
Main parkinglot
Golf cart path
Golf cart path
Golf cart path
Main parkinglot

+25

Response time8 hrs
Response rate97%
19 neighbors recently requested a quote
Avatar for Triple C Excavation
Triple C Excavation
5.0(
17
)
Concrete Driveways & Floors - Install- For BusinessConcrete Driveways - InstallGravel or Loose Fill Paving - Install, Spread or Scrape+1 more

Serving Marionville, MO and surrounding areas

Approved

Super Service Award Winner

In business since 2005

Free estimates

Credit card accepted

"I got this company just randomly off of Google and the gentleman returned my call within minutes. He was very courteous kind and took the time I needed to explain what I needed. If I ever need any kind of work like this again, I will remember him five stars."
Response time5 hrs
Response rate97%
4 neighbors recently requested a quote
Avatar for ATX Asphalt Paving
ATX Asphalt Paving
4.5(
19
)
Asphalt Paving - InstallAsphalt Paving - Repair or PatchAsphalt Sealing+1 more

Serving Marionville, MO and surrounding areas

Approved

Free estimates

Emergency services offered

Credit card accepted

"Due to the wet spring weather the planned start date slipped a little but then I had to move it because of business travel. Once they got started, everything went great. They graded and leveled the old gravel driveway that had washed due to the heavy spring rains. Then applied 2 layers of chip seal and the new driveway looks great. I was originally planning to just have it graded and re-graveled but after talking with Jerome, decided it would be worth the extra cost to do the chip seal and it was.
Jerome, Ollie and the rest of the crew were very professional and polite.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

6 neighbors recently requested a quote
Recommended by82%of homeowners
...
Showing 1-10 of 159
Asphalt Driveways FAQs, answered by experts

Yes, with colored finishes and decorative stamping for a personalized touch.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

In terms of durability, concrete driveways can last more than 50 years when properly maintained, compared to the typical 30 years for an asphalt driveway. However, the durability depends on the climate, base material and thickness, and thickness of the concrete or asphalt used. The longevity of concrete or asphalt driveways also depends on how well it’s maintained and the amount of wear and tear it endures.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Marionville, MO homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.