Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Lowry City, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Lowry City, MO?

Select your specific project to find the pro for you.

Find Ceramic tile pros in Lowry City

Avatar for Webster Construction
Webster Construction
New to Angi
Tile: Ceramic and Porcelain - Install

Serving Lowry City, MO and surrounding areas

Approved

Small jobs welcome

I’m a young outgoing individual, I’ve had a full time job since I was 14 trying every trade you can think of I have several years of plumbing under my belt, I’m a skilled framer, I’ve done electric for several years and even done mechanical work, I found a love and passion for handyman work and decided I was ready to take the leap on my own! If you need anything done no job is to big or small don’t be afraid to reach out I’d love to come check it out for you!!

Avatar for Jill Seidner Interior Design
Jill Seidner Interior Design
3.5(
89
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Lowry City, MO and surrounding areas

In business since 2006

Credit card accepted

"Once I sent her all the measurements, it took her a little while to get the options back to me.  Overall, they're good designs.  However, they're very simplistic and give general ideas for space planning.  I was hoping to have a better idea for sizes of furniture for the space and some variations on staging.  
Jill was very responsive when I did have a question.  I'm not sure how helpful it is to have a virtual design done.  If we lived in similar cities, I'd probably use her again for help with additional designs.
"
Recommended by55%of homeowners
Avatar for USClean
USClean
3.6(
10
)
Tile: Ceramic and Porcelain - InstallTile: Ceramic and Porcelain - Install - For BusinessTile: Ceramic and Porcelain - Repair+1 more

Serving Lowry City, MO and surrounding areas

In business since 2003

Free estimates

Emergency services offered

"USclean was very friendly and proffesional, I like the fact that when they arrived they knew exactly what they were doing and got started right away and wasted no time. There was lots of mold and mildew in our shower with broken grout lines, they're regrouting and tiles resealing took care of all that, now my shower looks new. I highy recommend this company!!
"
Before the Carpet was Cleaned
During the Carpet Cleaning Process
After the Carpet was Cleaned
Ceramic Tile before it was Cleaned
Ceramic Tile after it was Cleaned

+12

Recommended by83%of homeowners
Showing 1-10 of 38
Ceramic Tile questions, answered by experts

Installing kitchen countertop tiles on a mold and moisture-resistant cement backer board is one of the best options. When fitted correctly on top of a plywood base, it’s stable and long-lasting. Old-fashioned cement board is economical, cuts neatly and easily with a circular or jigsaw, and screws into plywood without any difficulty.

No, you don’t need to remove the old grout before installing new tile over existing tile. In fact, the old grout helps fill in gaps between tiles, creating a more even surface for the new layer. However, it's important to ensure that the grout is clean, solid, and free of cracks or crumbling areas. Damaged grout should be repaired or replaced before proceeding. Cleaning the surface thoroughly and filling any low spots will help the new adhesive bond properly and ensure a smooth, stable installation.

Installations typically take 1-3 days, depending on area size; repairs are usually completed sooner if the issue is localized.

It’s best to start with tiling the shower floor before moving on to the walls for the most visually-pleasing results. When taking on any tiling project, you’ll want the wall tiles to “sit” neatly on the floor tiles rather than overlapping them. Finishing your floor tiles first will allow you to place your wall tiles without any gaps, holes, or awkward intersections.

The process takes two to four days, depending on the size of the area and your experience level. The first day involves assessing and prepping the existing tile, while the second day is for laying the new tile. This may take longer in complex areas. After letting the adhesive dry for 24 hours, grouting and sealing can be completed on day three. For larger projects or intricate tile patterns, expect the timeline to stretch a bit longer. Also, proper drying time between steps is essential for long-lasting results, which extends the project’s time.

The Lowry City, MO homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.