Top-rated basement remodelers.

Best basement remodelers near Liberal, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Liberal, MO?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Liberal - Updated Nov 2026

Pfeifer home remodeling
5.0(
10
)
Basement - Remodel

Serving Liberal, MO and surrounding areas

In business since 2007

Free estimates

Credit card accepted

"Stephen was very professional. They arrived on time every day, and always asked questions each step of the way to ensure we were happy with the outcome. When we didn't like the cabinets that were picked out for either side of the fireplace, Stephen custom built ones to our liking. We were very please with his services, would definitely hire him again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Liberal, MO and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
ART Painting & Construction
5.0(
1
)
Basement - Remodel

Serving Liberal, MO and surrounding areas

In business since 1991

Free estimates

Credit card accepted

"Drew remodeled a bathroom for me a few years back. Due to structural issues, rotted wood and a quirky design, it turned into a much larger project than anticipated. He took the time to do things right and somehow got the jacuzzi tub in place and did an excellent job with the tile work. I would have no problem hiring him again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+8

Recommended by100%of homeowners
Showing 1-10 of 28
Basement Remodel FAQs, answered by experts

In addition to overseeing new home builds, construction managers work on large renovations and major remodels. For example, they may work with designers and oversee the construction of a finished basement, kitchen renovation, or a home addition. They may also oversee large-scale remodels, such as the update of a historic home. Construction managers step into small projects for more specific assistance, such as building budgets and compiling the team.

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

A finished basement does not always count as square footage, as this varies by state regulations. In areas that allow below-grade spaces to be included in a home's official square footage, the basement must typically meet certain conditions. These conditions often include having a functional egress and being a livable space with flooring, finished walls, and temperature control. To be certain, contact your local assessor to confirm your area's specific policies regarding basement square footage.

Renovation enhances functionality, increases home value, and can add new space for personal or family needs. It typically modernizes older unfinished basements for new uses.

The Liberal, MO homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.