Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Anderson, MO

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Anderson, MO?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Anderson

Avatar for ATX Asphalt Paving
ATX Asphalt Paving
4.4(
18
)

Serving Anderson, MO and surrounding areas

Approved

Free estimates

Emergency services offered

Credit card accepted

"I think Jerome and Ollie are great people. They are aware I was (and am) disappointed in the finished look of the driveway. My reason is because they put a much thinner layer of chip stone on the back part of the driveway vs the front. There are still spots so thin (lacking chip) that the tar is clearly visible. Plus, there is a noticeable drop-off at the front to back transition point on the circle which looks bad (less than professional) in my opinion. When I pointed out my concerns and asked them to remedy the matter, they declined to do so, However, on a positive note, the driveway, as is, seems to be holding up well since it was installed 2 years ago. It is serving its purpose, and we like it better than the former road base driveway. It just did not (and does not) look like a quality finished product. I believe ATX will do a good job for any client per the agreed contract. My recommendation to anyone planning to put in a chip-seal drive is to clearly specify everything, such as, desired driveway thickness, or the number of layers to be done, etc.. Also, be aware that grass & weeds will still grow through such a driveway, which is nature, and not the fault of the contractor. Be prepared to invest in lots of roundup and a good pump sprayer."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+21

4 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Stewart's Asphalt Paving
Stewart's Asphalt Paving
4.9(
20
)

Serving Anderson, MO and surrounding areas

In business since 1980

Free estimates

Warranties offered

"The rains had washed the entrance to our driveway out and formed a large ditch. After almost a year of posting on some sites this company responded. They repaired and made a new entrance to our driveway. It looks wonderful. They were kind and professional. They got the job done. I give them 5 stars"
Tar and chip
Asphalt
Asphalt
Asphalt
Asphalt

+1

Response time3 days
4 neighbors recently requested a quote
Recommended by94%of homeowners
Avatar for Crawfords Fencing and Dirt Work
Crawfords Fencing and Dirt Work
4.5(
11
)

Serving Anderson, MO and surrounding areas

In business since 2018

Free estimates

"Gabe did an amazing job. We live on a slopped yard and had a pool put in. He installed a 8 foot privacy fence with a double gate, reinforced by metal frame (it looks amazing) on two sides of the yard. The rest of the yard black chain link fence. His crew was very precise and cleaned up after everything was done. This is the second property Gabe ( Crawford Fencing and dirt work) has installed fencing on for us. High quality work goes along way. We would recommend him and his crew to anyone looking for a high quality fence."
Decorative Drainage
Decorative Drainage
Additional Photos
Additional Photos
Additional Photos

+36

Recommended by81%of homeowners
Avatar for Iron Strong Stone and Masonry LLC
Iron Strong Stone and Masonry LLC
5.0(
1
)

Serving Anderson, MO and surrounding areas

In business since 2023

Free estimates

Credit card accepted

"I have had them do three separate jobs all installing rock beds in my yard where grass wonâ t grow and roots are shallow. They have done great work with minimal damage to the yard (equipment will always leave a mark). Very happy and will use again."
Response time12 hrs
Recommended by100%of homeowners
Showing 1-10 of 15
Asphalt Driveways questions, answered by experts

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Recycled asphalt is a durable choice for a driveway, but doesn’t have the same appearance and low maintenance as standard asphalt. For long driveways in rural communities, recycled asphalt can make a great choice. Recycled asphalt is 20% to 30% percent less expensive than standard asphalt and is better for the environment. 

This creates a risk for your driveway to fail after asphalt curing because it doesn't have a lasting bond with the surface. In order to get asphalt to perform as intended, it's necessary to prepare the dirt surface correctly first. The loose soil base under the new driveway must be compacted until it is stable enough to support the weight of the asphalt.

Common alternatives to a gravel driveway include concrete, asphalt, brick, stone pavers, and permeable pavers. Concrete and asphalt are generally the most affordable options. However, concrete can be prone to cracking in cold climates, while asphalt may soften in areas with high heat and direct sun exposure. For enhanced curb appeal, brick, stone, and permeable pavers are popular choices, though their installation can be more expensive due to intricate designs. Stone pavers offer a natural look and are sometimes installed with gravel around them. Both permeable pavers and brick driveways provide excellent drainage, which helps prevent flooding and reduce water runoff.

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

The Anderson, MO homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.

What do you need done? We’ll find top pros.
  • 🌱 "Mow a small front yard"
  • 🛠 "Fix a leaking pipe under the sink"
  • 🏠 "Repair shingles on an asphalt roof"