Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Waseca, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Waseca, MN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Waseca

Jellison Enterprises, LLC
New to Angi
Asphalt Paving - InstallAsphalt Paving - Install- For BusinessAsphalt Paving - Repair or Patch+1 more

Serving Waseca, MN and surrounding areas

In business since 1947

Free estimates

Credit card accepted

Jellisons Best Blacktop is Family Owned and Operated and providing exemplary asphalt, concrete, blacktop, and paving services throughout the Carver and surrounding areas. Our expertise is in driveway replacement, reconstruction, seal coating, and crack filling. The job is done right the first time by experienced crews who know the climate and have the technical skills for the type of materials that will give you a lasting result. \n\nCall Wayne to get your residential or commercial job scheduled today! \n"Experience the Difference.....Call Jellisons"

Showing 1-10 of 35
Asphalt Driveways questions, answered by experts

Professionals ensure a solid base and smooth finish, enhancing durability and appearance.

Even with regular maintenance, most driveways don’t last much longer than 30 years. Alligator cracking is a clear warning sign that your driveway’s foundation is failing, and cracks that are deep and wide can let water in, causing more damage. Standing water is another red flag. If your driveway doesn’t drain properly, it’s going to degrade slowly. Finally, if you’re seeing dips or uneven patches, that’s a sign the base layer or soil is shifting. If these issues pop up, it’s time to replace your driveway.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

To maintain their strength, asphalt driveways and parking lots need to be sealcoated once every two to five years. You may also need to reapply paint striping every few years as it fades to ensure drivers can safely navigate the parking lot.

While blacktop is a type of asphalt, the terms should not be used interchangeably, as not all asphalt qualifies as blacktop. The primary differences are in their composition, production process, and ideal applications. Blacktop contains more stone than other types of asphalt and is heated to a higher temperature during production—300°F or more—while hot-mix asphalt is heated to between 275°F and 300°F. The ratio of bitumen (a tar-like crude oil) is a key differentiator, though sources vary: some state blacktop has less bitumen, making it less durable, while others claim it has a higher ratio. Due to these differences, asphalt is generally more durable and better for high-traffic areas like highways and streets, while blacktop is more suitable for playgrounds and residential driveways. For a driveway project, it is best to consult a professional to determine the most appropriate material.

The Waseca, MN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.