Top-rated painters.

Get matched with top painters in Jackson, MN

Enter your zip and get matched with up to 5 pros

Need a pro for your painting project in Jackson, MN?

Select your specific project to find the pro for you.

Find Painters in Jackson

Avatar for Nik's Exterior Interior Painting, Remodeling and Design, LLC
Nik's Exterior Interior Painting, Remodeling and Design, LLC
5.0(
1
)

Serving Jackson, MN and surrounding areas

In business since 2007

Free estimates

Credit card accepted

With over 50 years of combined experience, we pride ourselves on excellent customer satisfaction. We pay strict attention to quality and detail. We are the BEST of the BEST! If you are looking for an excellent job done and for your dreams to become reality, Call us today for an estimate!

Before the tile job
Before Remodel
Before Remodel
Flooring
After Remodel

+11

Recommended by100%of homeowners
Showing 1-10 of 19
Painting questions, answered by experts

If your cedar fence is new, don’t delay. Unlike treated pine, you don’t need to wait months for the wood to dry out for it to accept stain. With cedar, the sooner, the better. Seal cedar within two weeks of installation to prevent the sun from fading its red color.

Choosing the best color for your home exterior should factor in longevity as well as your personal taste. To keep your house looking newly painted as long as possible, stay away from red paint. Although red homes pop and are quintessential for country-style barns, red paint tends to fade fastest in the sun. Go with earth tones if you want paint that best resists fading.

If possible, it is beneficial to paint both sides of your fence to protect the fence more completely from the elements. Painting both sides of your fence will create a more consistent appearance as well. However, the time and cost involved in painting both sides of the fence may cause people to paint only the side they see.

While the answer varies based on weather, 10 a.m. is a good time to start painting. The dew will have dried, meaning there’s no moisture on the house, and the temperature will likely be moderate and the sunlight less direct. Starting mid-morning should also give you enough daylight and pleasant weather to work on the job for several hours.

Wood stain is typically dry to the touch within 6 to 12 hours, but it is not fully cured at this point. You should wait at least 24 hours before applying a second coat or a protective finish. For surfaces like decks, avoid walking on them for at least 24 to 48 hours, and wait even longer before placing furniture. The full curing process can take from 24 hours to one week, depending on the type of stain. Factors like high humidity and cold temperatures can extend drying and curing times, so it's wise to allow for extra time in these conditions.

The Jackson, MN homeowners’ guide to painting services

From average costs to expert advice, get all the answers you need to get your job done.