Install Above Ground Pools FAQs, answered by experts

Installation typically takes 4-8 weeks, including site preparation and liner installation.

It’s not ideal to swim in a cloud pool, as it can be a sign of algae, bacteria, or calcium buildup as well as chlorine, pH, or alkalinity imbalances. It is best to avoid cloudy water in pools until you determine the cause of the color change.

Detecting a leak in your pool costs about $300 on average. The price ranges widely from low $100 up to $1,000. Here are the costs involved in leak detection services for your pool:

  • Pool inspection: $125–$250

  • Above ground pool leak detection: $100–$700

  • Inground pool leak detection: $400–1,000

  • Vinyl liner repair: $350–$3,600

  • Fiberglass lining repair: $300–$400

  • Concrete liner repair: $75 per linear foot

  • Pressure test pool lines: $200–$500

  • Skimmer repair: $100–$250

  • Main drain repair: $400–$700

  • Pump repair: $50–$300

  • Tile repair: $20-$30 per linear foot

The total time to install an inground pool typically ranges from 8 weeks to 4 months. This timeline can be influenced by several factors, including permitting, site preparation, and the construction process itself.

Key phases and their typical durations include:

  • Permits: Obtaining necessary permits can take anywhere from two to six weeks.

  • Excavation and Site Preparation: This phase takes about a week but can be extended by problematic soil, unexpected ground conditions, or the need to move underground utility lines.

  • Construction: The actual build, including plumbing and electrical work, often takes one to two months. The pool material is a major factor here; a concrete pool needs about 30 days to cure, while installing a fiberglass or vinyl liner is much faster.

External factors can also cause significant delays:

  • Contractor Availability: Spring and summer are busy seasons, and high demand can lead to long waitlists, potentially adding months to your start date. It is often recommended to start planning and getting estimates up to a year in advance.

  • Other Delays: Weather, material shortages, complex designs, and other unforeseen challenges can extend the project timeline.

Yes, too much chlorine can make your pool cloudy, especially after you have recently shocked it. However, low chlorine levels are a more common cause of cloudy water. An imbalance in pH or an excess of any chemical can also lead to cloudiness. To determine the specific cause, you should test your pool water to check the levels of chlorine, pH, and other chemicals. Regular maintenance is essential for keeping your pool clean and clear.

The Ashby, MN homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.