Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Unionville, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Unionville, MI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Unionville

Avatar for Armored Asphalt
Armored Asphalt
4.0(
21
)
Asphalt Paving - InstallAsphalt Paving - Install- For Business

Serving Unionville, MI and surrounding areas

Approved

Emergency services offered

Customers say: True professional

"This company was fast and affordable. They beat all the quotes I had, and installed it a day later. Jeremy and his crew were very professional and knowledgeable. They answered all the questions I asked without any hesitation. I would recommend them for your next project 100%. Mike and Amy"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+16

Response time4 days
Response rate100%
11 neighbors recently requested a quote
Avatar for J.R.’s Dirt Work LLC
J.R.’s Dirt Work LLC
5.0(
3
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving Unionville, MI and surrounding areas

Approved

In business since 2001

Free estimates

Credit card accepted

JR'S DIRT WORK LLC is committed to excellence in every aspect of our\nbusiness. We uphold a standard of integrity bound by fairness, honesty,\nand personal responsibility. Our distinction is the quality of service\nwe bring to our customers. Accurate knowledge of\nour trade combined with ability is what makes us true professionals.\nAbove all, we are watchful of our customers' interests and make their\nconcerns the basis of our business.

Driveway refurbish
Barndaminium Pad
Barndaminium Pad
Barndaminium Pad
Barndaminium Pad

+4

24 neighbors recently requested a quote
Avatar for Steve Yax
Steve Yax
New to Angi
Interlocking Pavers for Driveways & Floors - Install

Serving Unionville, MI and surrounding areas

Approved

With over 10 years of experience as a union carpenter, I take pride in providing quality craftsmanship and dependable service. I have experience with a wide range of carpentry and home-improvement projects, and I believe in doing the job right the first time.\n\nWhether it’s a small repair, remodeling project, trim work, decking, framing, or a larger renovation, I pay close attention to detail and treat every customer’s home with respect. My goal is to deliver quality work, communicate clearly, and make sure every customer is satisfied with the finished project.\n\nI look forward to helping bring your next home-improvement project to life!

...
Showing 1-10 of 70
Asphalt Driveways questions, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Driveways should be sloped with a minimum 2% slope—anything lower will cause precipitation and runoff to collect. A 2% slope is the equivalent of a 2-foot rise over 100 feet. One quick way to check the integrity of your driveway’s slope: no more than four inches of water should collect on the surface longer than 15 minutes after rain.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

Asphalt is not a type of concrete. While both are a common type of pavement, asphalt is composed of aggregates (like sand and gravel) and bitumen; concrete is a mixture of cement, aggregates, and water. Here are some of the key differences between asphalt and concrete driveways.

Sealing coat asphalt after 6-12 months and then every 2-3 years is recommended.

The Unionville, MI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.