"Very satisfied with the end results of our project. The workers were very polite and respectful of my home. we had a 500 sf living room added, bathroom remodeled, new kitchen, new flooring all new windows, siding, roofing. Jamie the owner was very easy to work with. Thank You for a job well done. Dan and Melissa"
"They sent about 15 workers and 8 hours later we have a brand roof! They were very professional, covered my flowers and landscaping before doing the job, went through the yard after with a magnet to do all the cleaning up of the left over parts and nails. They were very careful with the job overall and did an amazing job."
"Jeff did an amazing job. He designed a gate to go across the stairs that works perfectly without taking up space. I still get compliments on the job he did. I would HIGHLY recommend him for a job."
Painting itself was excellent. The painters were neat for the most part. although we did find some small paint spots on the carpet.. Edge lines looked good, and we found very few defects that required correction. They did refer a problem with blotchy coverage to the manufacturer, who refunded the price of the paint for the bathroom, provided new paint, but did not pay for the labor involved in repainting that room.
Our major problems came with the estimate and billing. The original estimate was for $3200, and the final bill was over $4400. Our contact, Chris, blamed the difference on the fact that they underestimated the amount the number of coats and amount of paint that was required. Also, we found discrepancies in the amount we were billed for paint. This was blamed on the fact that they were doing work for "two Kathy's" and got the invoices mixed up. We had to argue with them to get the discounts we were initially promised. The job was originally estimated to be completed in 3 to 5 days, but took 2 1/2 weeks. They started painting on 8/13 and we did not settle our billing issues until 12/24. We tired of arguing with them and ended up paying for $73 in supplies they could not account for.
Also, they offered to give us a bill reduction in the amount of our Angie's List membership if we gave them a favorable review.
We would look elsewhere when we need painters again.
"I did not go with this company, they refunded my money because I didn't like their design. I've reviewed this before. Please can you stop these requests to do a review. "
"The work was done quickly, and everyone was extremely friendly and helpful. The only delay was waiting for the electric company to do their part. I'm thrilled to have my panels up and running!"
Unfinished Carpentry questions, answered by experts
Framing a house with steel generally takes less time—around five to eight weeks—than most building materials. The steel components can also be made quickly off-site and manufactured with pre-punched holes for running piping and electrical wiring, which will lessen the prep work and extra labor during construction.
To calculate the number of linear feet of baseboard you’ll need, measure the length of each wall of the room you’re installing them in as close to the floor as possible, rounding up to the next full linear foot. If it’s your first DIY molding job, having a few extra feet on hand for miscuts is a good idea.
Yes, a 2x6 should hold a porch swing and safely support the load. A smaller joist runs the risk of it not offering enough support for the swing. If you have a joist smaller than 2x6, add additional bolstering support.
There are approximately 5.33 board feet in a 2x4. You can use the board foot calculator in this article to easily find the answer. A 2x4 is 2 inches of thickness by 4 inches of width, so you need to find the length, with 8 feet being the most common. You’d use the calculator here to multiply 2 times 4 times 8, and then divide by 12, arriving at a total of 5.33 board feet.
Professionals charge between $60 and $95 per hour to install ornamental porch columns. The amount of time they need varies based on the condition of the porch, whether they need to remove old columns, and if there is any damage to your porch's structure. This cost can increase if more issues come up during the installation process.
The Sanford, MI homeowners’ guide to contractor services
From average costs to expert advice, get all the answers you need to get your job done.
When you’re tackling a project or hiring a contractor, it’s helpful to know key carpentry terms. From end grain to dovetail joints, here’s a complete list.
House framing is one of the first parts of building a home. To do this, you’ll want to hire a rough or unfinished carpenter. Using this guide, you’ll know what questions to ask and where to look for your house framing contractor.