Top-rated excavation pros.

Get matched with top excavation pros in New Era, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in New Era, MI?

Select your specific project to find the pro for you.

Find Excavation pros in New Era

Martin Land Improvement, Inc.
5.0(
1
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For BusinessExcavation - Major Grading or Resloping+2 more

Serving New Era, MI and surrounding areas

In business since 1980

Free estimates

Emergency services offered

"They were fantastic he called me right back after I call. Very prompt, always available, the question I had he got all the information we needed for putting the septic and over all electrical wires, he explained everything. Over all great business people and I was very satisfied with the work that he did. I will definitely use them again, he always explained the cost about financial."
Recommended by100%of homeowners
Showing 1-10 of 33
Excavating questions, answered by experts

Excavation is priced in cubic yards, so you’ll need to find the volume of the area in order to calculate costs. Multiply the length, width, and proposed depth of your excavation site, then convert it into yards to get the volume. Multiply this figure by the price per cubic yard.

Most homeowners can measure by hand to get a rough estimate, even if it’s tedious. You may want to pull out a tape measure or use a string to help mark the area.

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.

Above ground pools are not buried in the ground. Typically, above ground pools are semi-permanent. One reason they’re more affordable is that you don’t have to dig for an inground pool and pour concrete or another material. However, you can choose to install a semi inground pool, which is a hybrid between the two.

While general contractors sometimes handle demolition, you can also look specifically for local demolition contractors. Demolition experts need to understand structural integrity, the equipment needed for safe demolition, and the permits required for demolition.

Digging out a basement takes anywhere from a few days to a few months. Most projects take at least two to five weeks, but it could take several months if you encounter obstacles. This project takes longer if you need to brace or raise your home before the excavation. Digging out a basement in new construction can take as little as three days.

The New Era, MI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.