Top-rated excavation pros.

Best excavation pros near Merritt, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Merritt, MI?

Select your specific project to find the pro for you.

Top-Rated Excavation pros in Merritt - Updated Nov 2026

Avatar for Knoch & Sons
Knoch & Sons
5.0(
2
)
Landscape - Minor Grading or ReslopingBuilding Site - Preparation and Clearing - For Business

Serving Merritt, MI and surrounding areas

Approved

In business since 1996

Free estimates

Credit card accepted

"Upon moving into a new house, we needed to modify our existing pole barn with taller doors to accommodate our travel trailer. The garage door company highly recommended Knoch and Sons to do the construction. Randy and Tina Knoch responded promptly to our call and devised a plan to accomplish the job. Not only did they modify one of the front garage doors but they also added a new opening in the back of the barn for an exit door. The work was done promptly and professionally. The barn looks like it was never touched! The install is perfect! We would highly recommend their work for any construction job!"
Knoch & Sons
2 neighbors recently requested a quote
Showing 1-10 of 44
Excavating FAQs, answered by experts

Maintain open communication and address issues as they arise, ensuring contract terms cover potential delays.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Dumpsters work best on hard, study, and level surfaces made of asphalt, stone, or concrete. If the surface is uneven or too soft, the dumpster could get stuck or tip over when filled. Keep in mind that you must obtain a dumpster permit to keep it on a city street in many areas.

Underground downspouts refer to the sections of downspout extensions that lead away from your home and gutter system. While they cost more than traditional extensions, they can provide several benefits, such as less frequent damage and no need to move them for lawn care tasks. Whether they're worth it or not depends on your budget at installation time and how much convenience they'll add to your situation.

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.

The Merritt, MI homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.