Top-rated ceramic tile pros.

Get matched with top ceramic tile pros in Marquette, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your ceramic tile service project in Marquette, MI?

Select your specific project to find the pro for you.

Find Ceramic tile pros in Marquette

Avatar for Eric Gustafson
Eric Gustafson
5.0(
12
)

Serving Marquette, MI and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

"He built a pole barn from start to finish and we couldn’t be more happy with his work. He is a hard worker who showed up on time everyday when he said he would be there."
Berg Barndominium
Berg Barndominium
Berg Barndominium
Berg Barndominium
Berg Barndominium

+70

6 neighbors recently requested a quote
Pearson Construction
New to Angi

Serving Marquette, MI and surrounding areas

In business since 2017

Free estimates

We pride our company on reliability, integrity and quality work. When Pearson Construction, is hired, we make it a point to provide the highest level of customer service. We work with both residential and commercial clients, and apply the same attention to detail regardless of project size or complexity. Whether you need plaster or drywall work done, Pearson Construction is the company to call. \n

Ceramic Tile questions, answered by experts

Figure out how much tile you need by measuring the backsplash area. Measure the height and length in feet and multiply to get the square footage. Don’t make adjustments for outlets or small cutouts but subtract the square footage for windows or other large obstructions from the total. To account for waste, get 10% more than your calculation.

On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.

When working on your bathroom floor tiling, you should always tile the floor first and then refit the toilet afterward. This has both practical and visual advantages—the tile will have a better seal, and the installation will look cleaner.

On the other hand, when you try to cut the tiles to fit around the toilet, you’re putting yourself at a disadvantage. It’s a lot more work, it’s hard to be precise, and mistakes or miscalculations can lead to future moisture damage to the tiling, grout, and subfloor.

Most professional shower tile installations take between six and eight hours, depending on the size and complexity. Most projects get completed in a single workday. DIY-ing the project takes around three to four days or roughly 16 hours. However, this will vary based on the skill level of the person completing the work.

No, you don’t technically need a cement backer board for a wall tiling project, but not using it risks disastrous moisture damage. Cement is naturally water-resistant, whereas drywall soaks it in, which can lead to warping or mold growth. Always use a backer board treated with a waterproof membrane for bathrooms and other chronically damp areas to ensure complete tile shower waterproofing.

The Marquette, MI homeowners’ guide to ceramic tile services

From average costs to expert advice, get all the answers you need to get your job done.