Top-rated subcontractors.

Get matched with top subcontractors in Clyde Township, MI

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Clyde Township, MI?

Select your specific project to find the pro for you.

TRUSTED BY CLYDE TOWNSHIP, MI HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon253
    Verified subcontracting services reviews

Find Subcontractors in Clyde Township

Avatar for 4 Ever Water Tite
4 Ever Water Tite
4.7(
116
)
Major Home Repairs (General Contractor)

Serving Clyde Township, MI and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"The guys from 4-Ever Water-Tite were great! Prior to contracting 4-Ever Water-Tite, I had problems with water and excess moisture in my basement. My basement walls were also pushing in laterally. They put in a perimeter drain system and a new sump pump. They also installed steel support beams to support the walls. I am happy to report that it has now been a full year since 4-Ever Water-Tite worked on waterproofing my basement and it has remained dry. I highly recommend this company."
Recommended by97%of homeowners
Avatar for MaxCraft LLC
MaxCraft LLC
5.0(
7
)
Major Home Repairs (General Contractor)

Serving Clyde Township, MI and surrounding areas

In business since 2021

Credit card accepted

"Needed basement floor tiles put into basement and the job was done beautifully. They were quick and professional and I couldn’t be happier with the results. Would definitely hire them again for any home improvements or repairs!"
Beautiful Elevated Deck Rebuild
Decks & Porches Project
Decks & Porches Project
Beautiful Lakehouse
Beautiful Elevated Deck Rebuild

+28

Recommended by100%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Clyde Township, MI and surrounding areas

In business since 2006

Credit card accepted

"They are a nice provider. I talked to them on the phone for about 30 minutes and they sent some samples. We were able to get a discount on designer purchases but not useful on designing the space. Once we told them what we wanted, they were able to help purchase from the warehouse and save about $1,500. I think they became too busy with this big deal. You buy a ticket per room and we still actually have a couple left with this provider. After redesigning one room, we kind of ran out of steam and have not designed the other rooms. Overall this is a good service and it's a good concept. Whomever I spoke with, she was really nice. I would recommend this provider. This kind of service seems to be for people with time and knows exactly what they want. They are super helpful with the designer discount from the warehouse. They don't actual design your room which is slight flaw."
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 33
Subcontractors questions, answered by experts

Custom homes can take an average of 18 months to build, mainly due to the lengthy design process, and most projects take somewhere between 12 and 24 months. When you work with the right custom home builders near you, they can help you map the road ahead and understand what can speed up or delay the timeline. Choosing locally available materials, for example, can speed things up without losing that customized touch.

Absolutely! You can tailor the design to meet your specific needs and preferences. Whether it's adding amenities, adjusting dimensions, or choosing different materials, customizing your storm shelter ensures it suits your family's requirements and offers the utmost comfort and safety during severe weather. So go ahead and create a shelter that perfectly fits your unique needs!

Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.

The best way to start designing a house is to know what you want before designing. Making a list of your biggest priorities in a home will help. Designing a house without an idea of what you need or want in a home will lead to many trials and errors that could make it harder to figure out what you need in your design.

If your project is complex, it may make sense to hire an architect to draw plans. An architect might also be a good person to hire if you want to ensure your plans adhere to building codes and regulations.

The Clyde Township, MI homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.