Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Bowdoin, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Bowdoin, ME?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Bowdoin

Holland's Masonry
New to Angi

Serving Bowdoin, ME and surrounding areas

In business since 2003

Holland's Masonry takes prides in performing quality workmanship at competitive prices. We respond in a timely manner on all bids and calls. Holland's Masonry completes jobs on schedule and on budget, while assisting the General Contractor in many ways. Experience speaks for itself. We have been providing quality construction services to satisfied customers for years. Let Holland's Masonry be your source for specialized custom masonry stoves, stone and brick fireplaces, mosaques, tile, chimneys, and all masonry restoration and waterproofing. No job too big or too small.\n\n� Stone\n� Brick\n� Block\n

brickett oven
 mosaques
 stone collums
 soap stone firebox
 paver walkway

+24

Concrete Mudjacking questions, answered by experts

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The exact time can vary depending on the size of the project. Because the slurry mixture contains cement, it must fully harden to ensure that added weight from walking, furniture, or vehicles won't shift the concrete slab. A professional contractor can advise you on when the surface is safe to use. For comparison, if you use polyjacking instead, the polyurethane foam can dry in just a few minutes, but it's best to wait about an hour before use.

Pros often use mudjacking or polyurethane foam injection to level a sunken concrete patio. Both methods lift the slab by filling voids beneath it. After properly compacting the soil beneath it to prevent future settling, the concrete may need to be removed and re-poured for severe sinking.

Costs range from $500 to $1,500, depending on the size and condition of the area.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

The polyurethane used for polyjacking will expand and cure in 15 to 30 minutes. After that point, your slab will be safe to walk on and even drive on in the case of a sidewalk or concrete driveway. Double-check with your concrete lifting specialist to confirm a curing timeline, as products can differ.

The Bowdoin, ME homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.