Top-rated basement remodelers.

Get matched with top basement remodelers in Bowdoin, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Bowdoin, ME?

Select your specific project to find the pro for you.

TRUSTED BY BOWDOIN, ME HOMEOWNERS

  • Average homeowner rating star icon4.5
    Average homeowner rating
  • Verified reviews icon18
    Verified basement remodels reviews

Find Basement remodelers in Bowdoin

Avatar for Leviathan Group LLC
Leviathan Group LLC
5.0(
9
)
Basement - Remodel

Serving Bowdoin, ME and surrounding areas

Approved

In business since 1996

Free estimates

Offers commercial services

"We had our kitchen completely remodeled by Hutchins and Son. Owner Don is great to work with. He was able to provide us with the exact custom cabinets and custom color we were looking for. I highly recommend Don and his son ."
Cabinet
Kitchen Island
Custom Cabinets
Pot Hangers
The Leviathan Group

+9

Response time2 days
Response rate95%
4 neighbors recently requested a quote
Avatar for Innovative Construction
Innovative Construction
3.7(
32
)
Basement - Remodel

Serving Bowdoin, ME and surrounding areas

Approved

In business since 2015

Free estimates

Emergency services offered

"I hired innovative construction to reside one side of my building. During the bidding of the project as well as during the execution of the work, Greg and his team were professional, timely and responsive. I would absolutely hire Greg and his team again"
Before
Deck Repair
Deck Repair
Before
MIDWAY

+9

Response time3 days
9 neighbors recently requested a quote
Recommended by45%of homeowners
Avatar for 506 Designs & Carpentry LLC
506 Designs & Carpentry LLC
4.4(
7
)
Basement - Remodel

Serving Bowdoin, ME and surrounding areas

Approved

Free estimates

Emergency services offered

"Brendan did a great job on assembling four pieces wood furniture. He had to construct a wood part that was missing from the materials. It turned out to be rather complex work and we appreciated his attention to detail. Hope we can work with him again!"
40 neighbors recently requested a quote
Avatar for G.A. Doughty Construction
G.A. Doughty Construction
3.4(
17
)
Basement - Remodel

Serving Bowdoin, ME and surrounding areas

Approved

In business since 2003

Free estimates

Credit card accepted

"We had a great experience working with G.A. Doughty Construction. From the start, their team was communicative, responsive, and collaborative—making sure we were involved and informed at every step. They helped us navigate and recover from a difficult prior experience, stepping in with professionalism and integrity to get the work done right. Their commitment to quality and transparency gave us real peace of mind, and we’re grateful for their expertise and support throughout the project."
Custom Kitchen
Response time1 day
21 neighbors recently requested a quote
Recommended by57%of homeowners
Williams Construction, New Construction & Remodeling, Inc.
3.5(
3
)
Basement - Remodel

Serving Bowdoin, ME and surrounding areas

Approved

In business since 2005

Free estimates

Credit card accepted

We take great pride in our experience, expertise, quality, and customer service that we provide to meet the consumer's needs. It is our mission to provide excellent workmanship and complete customer satisfaction from start to completion of a project. In order to understand the needs and expectations of our customers, we take great care to work and communicate with every customer in a professional manner. Our reputation is based on service, safety, and quality, regardless of how large or small the job.

Project photos
Project photos
Project photos
Project photos
Project photos

+13

Response time30 mins
Recommended by66%of homeowners
Avatar for Next Level Design
Next Level Design
New to Angi
Basement - Remodel

Serving Bowdoin, ME and surrounding areas

Approved

Small jobs welcome

Offers commercial services

@NextLevelDesign.us , we specialize in high-quality kitchen remodeling and renovation services for homeowners throughout Portland and Southern Maine. We help clients transform outdated or inefficient kitchens into functional, beautiful spaces that add value and comfort to their homes.\n\nFrom complete kitchen remodels to custom cabinetry, countertops, flooring, tile work, and lighting, we manage every phase of the project with attention to detail and clear communication. Our goal is to deliver craftsmanship you can see, timelines you can trust, and results that exceed expectations.\n\nWe work closely with each homeowner to understand their vision, budget, and lifestyle needs—then execute with precision. Whether you are modernizing your kitchen, improving layout and storage, or preparing your home for resale, Next Level Design is committed to quality results and customer satisfaction.

Renderings
Two tone
Outdated Kitchen
Under Construction
Complete

+3

...
Showing 1-10 of 107
Basement Remodel questions, answered by experts

Rebar is an essential part of reinforcing a basement floor, as not having it can impact its structural integrity. It helps absorb the tension factors that contribute to cracks in your floor and strengthens its load-bearing capabilities by evenly distributing the weight. Not including rebar could lead to an unstable floor, so don’t skip it!

You can paint your ceiling or install a drywall ceiling if the ceiling is unfinished, as they take up less headroom than drop ceilings. 

If there are pipes in the way of ceiling installation, you can do one of two things: reroute the pipes or adjust the installation to fit, which will cost extra.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Basements with persistent moisture problems or flooding shouldn’t be finished until the moisture issues have been fixed. In addition, if your foundation is cracked, you have unmitigated radon levels, or you have asbestos or lead pipes, remediate the underlying problem before finishing your basement. Turning a basement into living space before fixing these issues can lead to serious health risks or structural damage. 

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

The Bowdoin, ME homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.