Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Boothbay, ME

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Boothbay, ME?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Boothbay

S.Jones Chimney Service & Masonry
New to Angi
Concrete - Injection Leveling - Mudjacking

Serving Boothbay, ME and surrounding areas

In business since 2019

Free estimates

Emergency services offered

S.Jones Chimney Service & Masonr is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Concrete Mudjacking questions, answered by experts

There is no real alternative to underpinning, although mudjacking and polyjacking are other repair methods that can add support from underneath your foundation. Rather than placing supportive piers under your structure, these involve pumping a material under your slab to lift a sunken section back into its original position. Polyjacking, in particular, is sometimes a suitable solution for stabilization issues under slab foundations, but underpinning is often accepted as the best and most permanent solution.

Costs range from $500 to $1,500, depending on the size and condition of the area.

The method involves lifting settled concrete using pressurized cement slurry via drilled holes. This solves uneven surfaces and prevents further settling.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

A good slump height really depends on the project, but there is a use for nearly all slump levels. For example, low slumps are best in projects that require structure, such as curbs and roads. High slumps often require additional reinforcement, but they flow more freely into hard-to-reach spaces.

The Boothbay, ME homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.