Top-rated basement remodelers.

Best basement remodelers near Whaleyville, MD

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Whaleyville, MD?

Select your specific project to find the pro for you.

TRUSTED BY WHALEYVILLE, MD HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon12
    Verified basement remodels reviews

Top-Rated Basement remodelers in Whaleyville - Updated Nov 2026

Avatar for M Phippin Contracting Inc.
M Phippin Contracting Inc.
5.0(
22
)
Basement - Remodel

Serving Whaleyville, MD and surrounding areas

Approved

In business since 2012

Free estimates

Warranties offered

"M Phippin did a great job on our 2 room addition. He has the most detailed and easy to understand quote. He stuck to his quote. The work was done in a timely manner considering corona virus came into play towards the end of the remodel. We absolutely love the 2 rooms he did and I wouldn’t think twice to hire him again."
Decks & Porches Project
Bethany Beach Kitchen
Bethany Beach Privacy Carport
Selbyville, Del. Kitchen Remodel
Entry Door

+190

Response time1 day
Response rate100%
6 neighbors recently requested a quote
Andrade Construction
4.6(
13
)
Basement - Remodel

Serving Whaleyville, MD and surrounding areas

In business since 2013

Free estimates

Credit card accepted

"Andrade have completed several projects for me to include roofing, flooring, bathroom remodeling, fireplace, and wall repairs. I have been extremely happy with the work he has done. So much so, that I plan to have him construct a retaining wall. His crew is professional, timely, and creative. He are exceptional in proving ideas to improve projects. Plus their prices are very reasonable. Happy Customer!"
Response time2 days
Recommended by91%of homeowners
Avatar for Accurate Upgrades LLC
Accurate Upgrades LLC
4.1(
8
)
Basement - Remodel

Serving Whaleyville, MD and surrounding areas

In business since 2013

Free estimates

Credit card accepted

"Accurate Upgrades has done a floor project and upgrades in a bathroom for me. They did excellent work on both projects and I'm working on additional projects with them as well. I highly recommend them!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+6

Recommended by85%of homeowners
Avatar for Feger Construction Company LLC
Feger Construction Company LLC
5.0(
5
)
Basement - Remodel

Serving Whaleyville, MD and surrounding areas

In business since 2023

Free estimates

Emergency services offered

"Feger Construction Co. LLC are wonderful. Very professionals on all aspect. Very neat work. The Costumer Service Super. Bilingual team. The Price was perfect for my budget. I recommend 100%. Se los recomiendo a toda la comunidad Hispana and Philadelphia."
Response time7 hrs
Response rate96%
Recommended by100%of homeowners
Showing 1-10 of 44
Basement Remodel FAQs, answered by experts

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

You should plan on waiting at least a year and ideally two to three years after construction before finishing your basement. This will give the foundation time to settle in response to the weight of your home and the expansion of the surrounding soil. You can then repair your foundation and seal any cracks as needed before finishing it to reduce your risk of future leaks or other issues.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The cost of finishing a basement is about $18,400 on average. As you can see, the framing portion of this project costs less, because you’re essentially just dealing with laying the foundation for a finished basement. The finishing portion of the project involves a lot more intricate work and design, as well as high-end materials.

Finishing a basement can provide a great return on investment, by increasing the market price of your home when you want to sell. Beyond that, there are many reasons to finish your basement. Doing so expands the usable square footage of your home, so you can enjoy it more, even as your family grows. Renovating your basement costs less in terms of time, energy, and money than having to search for and buy a new home.

The Whaleyville, MD homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.