Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in West Warren, MA

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in West Warren, MA?

Select your specific project to find the pro for you.

TRUSTED BY WEST WARREN, MA HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon17
    Verified asphalt driveway services reviews

Find Asphalt driveway pros in West Warren

Avatar for Republic Masonry
Republic Masonry
5.0(
23
)
Asphalt Paving - Repair or PatchConcrete Driveways & Floors - Install- For Business

Serving West Warren, MA and surrounding areas

Approved

Super Service Award Winner

In business since 2021

Free estimates

Emergency services offered

"Henry from Republic Masonry was excellent we hired him for the remainder of the winter season He was very respectful and even cleared the slush off the front walkway at no charge so we could safely get our mail 5 stars"
10x14 Concrete Patio
10x14 Pour Day
The Next Day
10x14 Concrete Patio
Clients Review

+2

Response time7 hrs
2 neighbors recently requested a quote
Recommended by65%of homeowners
Avatar for Masonry Plus
Masonry Plus
4.9(
20
)
Brick and Stone Driveways & Floors - InstallConcrete Driveways & Floors - Install- For BusinessInterlocking Pavers for Driveways & Floors - Install

Serving West Warren, MA and surrounding areas

Approved

In business since 1980

Free estimates

Offers commercial services

"Brian and Cory took up my old brick walkway, re-graded the area (we had a significant ‘ponding’ issue), relaid the brick in the original, beautiful pattern, filled in the spaces between the bricks. Brian is easy to communicate with, responds promptly, shows up when he says he will. We’ve now hired him to replace steps in our backyard. Thank you Brian!"
Walkway - Worcester, MA
Walkway - Worcester, MA
Retaining wall with steps
Retaining wall with steps
Patio

+51

Response time1 day
Response rate92%
6 neighbors recently requested a quote
Avatar for Marc Curtis DBA Construction Services
Marc Curtis DBA Construction Services
4.8(
38
)
Gravel or Loose Fill Paving - Install, Spread or Scrape

Serving West Warren, MA and surrounding areas

Approved

Super Service Award Winner

In business since 2013

Emergency services offered

Small jobs welcome

"Marc went above and beyond when installing a yard drainage system in our side yard. He was quick to give us a competitive quote, easy to work with, and got a complicated job done fast. I would highly recommend him for homeowners looking to modify the slope and or drainage plan for their plot."
Framingham, MA (Drainage and Re-grade)
Framingham, MA (Drainage and Re-grade)
Lot Clearing/De-Stumping
Yard Drainage/Discharge system
Southbridge,MA

+12

Response time12 hrs
Response rate88%
11 neighbors recently requested a quote
...
Showing 1-10 of 150
Asphalt Driveways questions, answered by experts

While the specific timeline for building a driveway can vary based on driveway length and local weather conditions, the average concrete driveway can require several days to lay down all of the different parts of the driveway. The curing process may require you to avoid using your driveway for a week following construction. Heavier vehicles should be kept off of a new concrete driveway for several weeks. Building a gravel driveway may take just one to two days in total.

Asphalt is made of aggregate materials (sand, rocks, and gravel) and bitumen, a viscous, petroleum-based, waterproof substance. These materials are mixed together at extremely high temperatures to form asphalt.

New asphalt goes through two stages: drying and curing. Drying typically takes 24 to 72 hours, after which the surface is solid enough for light use like walking or careful driving. While you may be able to park on it after 72 hours, the surface is still soft and should be treated gently. Full curing is a much longer process, taking anywhere from 30 days to a full year for the asphalt to reach maximum strength. During this extended curing period, the asphalt is susceptible to damage from heavy vehicles, sharp objects, and high temperatures. Factors like weather, the specific asphalt mix, and application thickness all influence drying and curing times. For the most accurate timeline and to ensure the longevity of your new asphalt, it is always best to consult with your installation contractor for their specific recommendations.

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

Sometimes, when people talk about asphalt driveways, they’re actually referring to asphalt concrete, which is a completely different compound. Asphalt concrete is asphaltic cement combined with sand or grit. It is significantly more lasting and durable than regular asphalt but also much more expensive. If you’re considering using asphalt concrete, ask an asphalt company for their expert opinions.

The West Warren, MA homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.