Top-rated basement remodelers.

Best basement remodelers near Hampden, MA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Hampden, MA?

Select your specific project to find the pro for you.

TRUSTED BY HAMPDEN, MA HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon36
    Verified basement remodels reviews

Top-Rated Basement remodelers in Hampden - Updated Nov 2026

Avatar for Remodel or Renew Home Improvement
Remodel or Renew Home Improvement
4.6(
296
)
Basement - Remodel

Serving Hampden, MA and surrounding areas

Approved

In business since 2018

Free estimates

Emergency services offered

"RORHI completed our basement renovation. They did fantastic work, and all the contractors were highly professional: the framers, the insulators, the drywallers, the electrician, and the finishers. They went above and beyond to accommodate some special requests, like installing a commercial dehumidifier and finishing the walls of the storage closet, which were not part of the original scope, which greatly enhanced the finished look. We had a great experience working with Evan, Mike, and Matt (the initial estimator), as well as Inmer (finishes and framing), Eddie (painter), and the electrician. Despite minor miscommunications leading to necessary changes, they promptly addressed our concerns, sending someone immediately or the following day to resolve issues. Overall, we were impressed by RORHI's dedication and responsiveness, and we plan to hire them again for our next projects."
Decks
Farmers Porch
Deck
Decks
Screened oom

+7

Response time12 hrs
Response rate95%
861 neighbors recently requested a quote
Sonart Construction Corp.
2.3(
7
)
Basement - Remodel

Serving Hampden, MA and surrounding areas

Approved

In business since 2013

Free estimates

Credit card accepted

Sonart Construction Corp. has over15 years of experience in providing a variety of exterior and interior renovation services. We provide services to Palm Beach, Broward and Miami-Dade Counties.. We specialize in Bathroom Remodeling, Kitchen Remodeling, Flooring and the list goes on. Customer satisfaction is what determines our success, which is why we take a hands-on approach and keep the customer informed through every phase of the project. When interacting with our company, you'll notice that we're particularly focused on the principles of quality workmanship, timely completion, competitive pricing, and integrity in all our business dealings. We combine knowledge and research with our extensive practical experience to ensure a specialized approach for your renovation needs. Give us a call today!

Avatar for The BullBag
The BullBag
5.0(
15
)
Basement - Remodel

Serving Hampden, MA and surrounding areas

In business since 2001

Credit card accepted

"We priced out dumpsters and initially, the dumpsters looked like the way to go but upon reading the fine print, we realized they would have cost more than a bullbag. Each dumpster was about $150-$200 BUT each ONLY included up to 1 ton of material, and the companies would charge me an additional $85/ton over it. The bullbag price was NOT based on weight but rather just filling the bag to the top of the bag. The bullbag not only saved me money, but the people were nice to deal with, but everything they said, they actually did. We have a house on the Cape and we will use them there too in March. We were told up front that there would be an additional $75 fee because of the location, but it is STILL cheaper and easier than a metal dumpster."
The BullBag truck in MA
The BullBag truck in NY
Toys for Tots
Recommended by100%of homeowners
Avatar for Hutchins Remodeling
Hutchins Remodeling
5.0(
15
)
Basement - Remodel

Serving Hampden, MA and surrounding areas

In business since 2003

"Steve finished our basement and everyone who has seen it is blown away. His attention to detail is amazing. He is reliable and does quality work.I would recommend him to anyone thinking of doing a home remodel project."
Basement Remodel
Bedroom addition
Complete Home Remodel (kitchen, bathroom, bedrooms, siding, roofing, hallway/staircase)
Bedroom Addition and Bathroom Remodel
Kitchen addition with patio installation

+63

Response time2 days
Response rate100%
Recommended by100%of homeowners
...
Showing 1-10 of 73
Basement Remodel FAQs, answered by experts

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Physically, the most challenging part of finishing a basement is installing egress windows or doors when the space is below ground level. Mentally, the hardest part may be envisioning the project and planning around load-bearing and mechanical obstacles.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Roughing in and connecting utilities are the hardest parts of finishing a basement, and they’re the parts we typically don’t recommend doing as a DIY project. Unfortunately, your finishing timeline can be extended by weeks while you wait for contractors and inspectors to install electrical wiring, plumbing lines, and heating/cooling equipment and carry out inspections.

The Hampden, MA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.