Top-rated subcontractors.

Get matched with top subcontractors in Rosedale, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Rosedale, LA?

Select your specific project to find the pro for you.

TRUSTED BY ROSEDALE, LA HOMEOWNERS

  • Average homeowner rating star icon4.7
    Average homeowner rating
  • Verified reviews icon157
    Verified subcontracting services reviews

Find Subcontractors in Rosedale

Avatar for One Bath Solutions
One Bath Solutions
4.9(
34
)

Serving Rosedale, LA and surrounding areas

In business since 2015

Free estimates

Credit card accepted

"One Bath Solutions provides excellent work at a very competitive price. Exceeded my expectations. Very considerate and cleaned up every day. He even brought us coffee one day! What more could you want?"
JH Bath
JH Bath
JH Bath
JH Bath
JH Bath

+32

Recommended by100%of homeowners
Avatar for NexGen Roofing & Remodeling
NexGen Roofing & Remodeling
4.9(
8
)

Serving Rosedale, LA and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"We are so satisfied with the work and the two men that completed our backsplash in our kitchen, this work is truly professional and my wife and I are 100% satisfied, I will be using them for more projects in the very near future??"
Luxury Bathroom Remodeling
Luxury Kitchen Remodeling
Luxury Home Remodeling
Luxury Bathroom Remodeling
Luxury Kitchen Remodeling

+347

Recommended by100%of homeowners
Avatar for Sunrise Roofing & Construction
Sunrise Roofing & Construction
4.6(
18
)

Serving Rosedale, LA and surrounding areas

In business since 1991

Free estimates

Emergency services offered

"Upon accepting the assignment, Eric showed us choices for our shingles and even gave us locations in the area where that particular type and color shingle had been used. His team showed up exactly as promised, did what they were supposed to do AND MORE, cleaned up beautifully and left in a timely manner. Even though there was MUCH MORE repair work on the roof underlayment than expected, the quoted price remained the same. In an industry where "war stories" abound about unscrupulous operators, It was an absolute pleasure to deal with Mr. Newsome and Sunrise Roofing."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+4

Recommended by88%of homeowners
...
Showing 1-10 of 101
Subcontractors questions, answered by experts

How long it takes to build an in-law suite will vary by type. The time it takes to build an addition will typically be less than for completely new construction. Expect to spend about two months if you convert a basement, attic, or other existing room in your home. New structures can take up to five months, plus up to two months to receive the required permits.

Yes, professionals offer design services that ensure cohesive appearances.

Yes, designing builds to fit space constraints and meet functional needs.

Framing is often the most expensive phase of building a house because it’s time-consuming and requires a lot of materials. It costs between $20,000 and $50,000 on average, depending on materials and labor costs. Before construction begins, it’s possible that purchasing land is the priciest step in the process. Some plots of land sell for $3,000, while others cost upwards of $150,000.

Mid-century modern architecture was a popular home style throughout the U.S. from the 1950s to 1970s. Most homes feature a wide and symmetrical floor plan with low-sloped roofs and floor-to-ceiling windows. Its minimalism and balanced appearance are back on the home style scene, particularly when maximizing sunlight, airflow, and a blend with the home's natural surroundings.

The Rosedale, LA homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.