Top-rated carpenters.

Best carpenters near Livonia, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your carpentry project in Livonia, LA?

Select your specific project to find the pro for you.

Top-Rated Carpenters in Livonia - Updated Nov 2026

Avatar for D & D Construction of Rayne, LLC
D & D Construction of Rayne, LLC
3.2(
418
)
Deck or Porch - Repair

Serving Livonia, LA and surrounding areas

Approved

In business since 2002

Free estimates

Emergency services offered

"I gave the dimensions of the cement slab I wanted and I was quoted over the phone. I didn't have to wait for someone to come out. Often times these contractors come out to see where you live and what they think you can afford to pay. If you live in a nice area, they double their fees. It's happened to me on more than one occasion. Giving me the price over the phone for the exact size I wanted made me feel like the contractor was an honest guy. The installation was arranged right away and the crew got there early. They focused on the job until they were done. They did an excellent job! Would recommend this company highly!"
Tina Landry
Tina Landry
Tina Landry
Tina Landry
Tina Landry

+2

Response time7 hrs
234 neighbors recently requested a quote
Recommended by78%of homeowners
...
Showing 1-10 of 195
Carpentry FAQs, answered by experts

Baseboards don’t have to be nailed into studs. However, nailing them into studs adds to their stability. When studs aren’t available, you can secure them with drywall nails directly into the drywall and adhesive. Always aim to nail into studs, especially in high-traffic or impact-prone areas.

Framing a house with steel generally takes less time—around five to eight weeks—than most building materials. The steel components can also be made quickly off-site and manufactured with pre-punched holes for running piping and electrical wiring, which will lessen the prep work and extra labor during construction.

When deciding if you should use 2x6 or 2x8 deck joists, consider the size of the deck, joist spacing, and materials. Larger decks, larger-spaced joists, and weaker wood all require more support, meaning they need larger joists. For example, 2x8 redwood joists spaced 16 inches apart can only safely span up to 10 feet and 7 inches. On the other hand, 2x10 southern pine joists spaced 12 inches apart can be as big as 16 feet and 2 inches. If you aren’t sure what size joist is best for your project, speak with your deck builder.

Bow windows need support because they are large and extend out from the exterior wall of the home. Bow windows may extend 1 foot to several feet from the outside of the home, so you’ll need to provide additional support to handle this weight. A window contractor will be able to provide the proper amount of support for your new bow window.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

The Livonia, LA homeowners’ guide to carpentry services

From average costs to expert advice, get all the answers you need to get your job done.