Top-rated epoxy flooring pros.

Get matched with top epoxy flooring pros in Leesville, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your epoxy flooring service project in Leesville, LA?

Select your specific project to find the pro for you.

Find Epoxy flooring pros in Leesville

Avatar for Genesis Electric, LLC
Genesis Electric, LLC
5.0(
5
)
Concrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Leesville, LA and surrounding areas

In business since 2022

Free estimates

Emergency services offered

"Tony came and installed 2 ceiling fans in our bedrooms bc it’s had been hot in those rooms. They let me know upfront how much it would cost and was very informative about the process. I would recommend them to all my family and friends."
60A Sub Panel
Outlets
200A meter Disconnect
200A Meter Disconnect
200A Meter Disconnect

+19

Response time2 days
Response rate100%
Recommended by80%of homeowners
Avatar for T Square Contractors, LLC
T Square Contractors, LLC
3.9(
4
)
Concrete Finishing, Overlays & Coloring - ApplyConcrete Floor Coating-ApplyConcrete Floor Coating-Apply - For Business

Serving Leesville, LA and surrounding areas

In business since 2020

Free estimates

Warranties offered

"I hired T Square Contractors LLC to do a Rustic Wood concrete overlay on my back patio. They where very professional. The job was completed when they said it would be. The quality of their work was great. They kept my back yard clean throughout the whole process. I will definitely use them again in the future."
Graniflex pool deck
Rustic concrete wood
Rustic concrete wood patio
Italian Marble epoxy flooring
Metallic Marble Epoxy in a Beauty Salon

+15

Response time10 hrs
Recommended by33%of homeowners
Paragon Pools Design And Construction
4.3(
6
)
Concrete Finishing, Overlays & Coloring - Apply

Serving Leesville, LA and surrounding areas

In business since 1985

Emergency services offered

Credit card accepted

"It went very well.  Construction was behind schedule due to the weather.  Approximate build time was 11-12 weeks. Christian did everything we contracted him to do with no hidden expenses or extra charges.  He provided us a packet with all the build details and costs.   He didn't bill us till what we thought was the appropriate time for each stage of the building process.  If we needed to call him and ask questions, he always answered or called us back within a short amount of time.  Christian worked with a two to three man team and they were always professional and respectful.

Christian looked at our property and gave us a vision of what he thought would work and look good.  We trusted his vision and it came out perfectly.  We requested some additional changes and he was very accommodating.  One was outside the budget and we felt the extra expense was very fair.  

The pool came out great.  Everything was level, the travertine and tile (water line) came out perfect.  The travertine was cut perfectly and uniform around the edges.  We were very happy with the color of the plaster (he recommended), tile, travertine, and the rock (tanning ledge).  After completing the pool, Christian provided us with the cleaning equipment including a pressure side pool cleaner, skimming net and scrub brush, and chemicals to get started.




"
Recommended by83%of homeowners
Showing 1-10 of 26
Epoxy Flooring questions, answered by experts

You primarily need to be concerned about the moisture level in concrete when you are dealing with a basement or other below-ground part of your house. If you find any indication of moisture in your subterranean space, consider calling in a professional for further testing and moisture control solutions.

While there is a lot to like when it comes to epoxy flooring, there are some disadvantages for you to consider. For one, this flooring gets very slippery when wet, which means that it might not be the best option for homes with young children and older adults. Using an anti-slip coating can help.

Also, the installation period requires a long curing time of several days. Wet epoxy also releases strong smells during this curing period, which requires proper ventilation and safety gear.

Evenly wetting a wood floor before applying a stain is called water popping. It raises the grain and opens the wood’s pores to absorb more stain. When done properly, it can make the stain look darker and deeper. However, it’s important to evenly wet the floor and let it dry before applying the stain.

If your garage floor is heavily soiled or stained, then it’s a good idea to powerwash it with a concrete cleaner before sealing. This process will remove dirt and debris to help the new sealer bond to the concrete properly, and it will also improve the look of your sealed garage floor. After power washing your floor, make sure you let the concrete dry completely before applying sealant, usually for 24 to 48 hours.

You can whiten concrete for unsealed and unfinished concrete with a solution or either muriatic acid or bleach and water—but never both. However, if your concrete does have a stain, finish, or polish, keep in mind that these hard chemicals could damage the topcoat. Your best bet otherwise is to power wash outdoor concrete slabs or clean indoor ones with a gentle cleaner such as laundry or dish detergent.

The Leesville, LA homeowners’ guide to epoxy flooring services

From average costs to expert advice, get all the answers you need to get your job done.