Top-rated excavation pros.

Get matched with top excavation pros in Lakeshore, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Lakeshore, LA?

Select your specific project to find the pro for you.

Find Excavation pros in Lakeshore

Avatar for JW&C OUTDOOR SOLUTIONS LLC
JW&C OUTDOOR SOLUTIONS LLC
5.0(
3
)
Building Site - Preparation and ClearingBuilding Site - Preparation and Clearing - For Business

Serving Lakeshore, LA and surrounding areas

Approved

In business since 2025

Free estimates

Emergency services offered

"Professional from beginning to end one phone call understood the job and saw what needed to be done . Received the phone call after with the estimate. Easy planning scheduling for the job to be done. Got it done on time and with any subcontractor, I have make sure they get paid on time. Like working with this company and will look forward to future working with them as I come across Project to complete."
Tree removal
1 neighbors recently requested a quote
...
Showing 1-10 of 56
Excavating questions, answered by experts

Trenches are typically 12 to 24 inches deep and 8 inches wide. However, the required depth depends on the specific project and local ordinances. For example, a French drain may need to be 18 inches deep, while a water pipe might require a depth of 24 inches and a drainage pipe 36 inches. Your city or county may have specific regulations, so it's wise to consult with an excavation professional to determine the correct depth for your project.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

No, fire blight does not survive free in the soil but instead is carried through insects, animals, rain, or wind during the spring. Keep in mind that it can also spread on tools, which is why you should always disinfect them in between cuts.

Septic drain lines (or leach lines) are typically buried between 18 and 36 inches underground, and should be at least 6 inches below the surface. These pipes are perforated and surrounded by filtering materials like sand or gravel. Burying the lines at this depth helps minimize odors and allows bacteria and other biological processes in the soil to effectively treat the wastewater. Burying lines too close to the surface can cause issues unless the soil is very compact and stable.

The Lakeshore, LA homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.