Top-rated basement remodelers.

Best basement remodelers near Avondale, LA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Avondale, LA?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Avondale - Updated Nov 2026

Avatar for SJB Renovation, LLC
SJB Renovation, LLC
5.0(
16
)
Basement - Remodel

Serving Avondale, LA and surrounding areas

In business since 2018

Free estimates

Emergency services offered

"We had a leak in our condo in the French Quarter. SJB came out after the leak was fixed & dried out, and repaired the drywall as well installed downlights. The work is amazing and the team was very friendly. We were extremely pleased with their work and will be using them for some future projects. A big sincere thank you to the SJB team for their speed & beautiful work!"
Response time10 hrs
Response rate90%
Recommended by61%of homeowners
Avatar for Harper Painting
Harper Painting
4.5(
20
)
Basement - Remodel

Serving Avondale, LA and surrounding areas

In business since 1991

Free estimates

Credit card accepted

"Mr.Harper did an excellent job. He was very prompt seeing us within a day and had the job finished by the end of the week. He and his crew were very trustworthy and reputable, I would strongly recommend them. He has the rest of the work here on this remodel.
"
Additional Photos
Additional Photos
Additional Photos
Recommended by87%of homeowners
Avatar for ROYAL RENOVATIONS
ROYAL RENOVATIONS
4.3(
27
)
Basement - Remodel

Serving Avondale, LA and surrounding areas

In business since 2011

Free estimates

Emergency services offered

"The provider is very responsive and keep the site clean and well organized. They gave me a quote about 10% less than similar service provided by Lowes (which has spoiled contractors you have to wait 5-6 weeks to arrive).
"
Additional Photos
Additional Photos
Additional Photos
Recommended by83%of homeowners
Avatar for Murga s Remodeling LLC
Murga s Remodeling LLC
5.0(
4
)
Basement - Remodel

Serving Avondale, LA and surrounding areas

Free estimates

Credit card accepted

"The job was done to my expectations and beyond! I love the new look in my house. I definitely recommend Murga’s Remodeling for any renovation you want or need to get done in your house."
Drywall installation, paint and floor installation
Drywall installation, paint and floor installation
Drywall installation, paint and floor installation
Drywall installation, paint and floor installation
Recommended by100%of homeowners
Avatar for Dem Boyz Construction LLC
Dem Boyz Construction LLC
5.0(
3
)
Basement - Remodel

Serving Avondale, LA and surrounding areas

In business since 2000

Free estimates

Credit card accepted

"The job was very professional and he did it in one week and I love it! I will get him to do all my other projects as well and highly recommend his services to anyone who is looking to do any type of projects!"
Remodeling - Kitchen & Bathroom Project
Painted kitchen and Cabinets
Remodeling - General Project
Remodeling - General Project
Complete bathroom renovation, painted walls install vanity, toilet and walk in shower.

+59

Recommended by100%of homeowners
...
Showing 1-10 of 80
Basement Remodel FAQs, answered by experts

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

Building up by adding square footage to the top of your home is often less expensive than adding a basement, but it depends on the specifics of your house, your property, and supply costs. Because building a basement requires excavation, it can be a more expensive option than building up.

Yes, it is possible to turn a regular basement into a walkout basement. Doing so involves excavating the land around at least one side of your basement foundation, installing retaining walls to create a permanent below-grade area outside your home, and then cutting into the foundation to install an exterior door that leads out to the new space. This is an expensive and time-consuming project, but it can add a lot of value and utility to your home.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

The Avondale, LA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.