Top-rated lead testing and removal specialists.

Get matched with top lead testing and removal specialists in Glencoe, KY

There are 0 highly-rated local lead testing and removal specialists.

Need a pro for your lead testing and removal project in Glencoe, KY?

Select your specific project to find the pro for you.

Find Lead testing and removal specialists in Glencoe

BreathSafe Radon and Moisture Control

5.00(
7
)

BreathSafe Radon and Moisture Control

5.00(
7
)
Customers say: Quick response
2 years of experience

I'm a certified specialist in Radon Mitigation have installed over 7000 systems in Kentuckiana and surrounding areas. We use the systems and products that we feel provide the best solution for our client's problem. I have over 10 years of experience and know what your home needs to be as safe as possible. Don't delay! Give me a call or click for an estimate today!

"Breathsafe did a wonderful job with installation! They worked fast and in some yucky weather too get our right on mitigation system installed! They are very fairly priced and you can tell that they don’t make it a goal to profit off of customers, but rather just make a living. VERY kid friendly couple, Lances wife played hide and seek with my 4 year old. 😂 I would bring them back for any project they are qualified to complete!!"

Madison G on April 2025

I'm a certified specialist in Radon Mitigation have installed over 7000 systems in Kentuckiana and surrounding areas. We use the systems and products that we feel provide the best solution for our client's problem. I have over 10 years of experience and know what your home needs to be as safe as possible. Don't delay! Give me a call or click for an estimate today!

"Breathsafe did a wonderful job with installation! They worked fast and in some yucky weather too get our right on mitigation system installed! They are very fairly priced and you can tell that they don’t make it a goal to profit off of customers, but rather just make a living. VERY kid friendly couple, Lances wife played hide and seek with my 4 year old. 😂 I would bring them back for any project they are qualified to complete!!"

Madison G on April 2025


Gump Demolition, LLC

595 Ring Rd
No reviews yet

Gump Demolition, LLC

595 Ring Rd
No reviews yet
4 years of experience

Gump Demolition, LLC provides demolition and abatement services to Ohio, Kentucky, and Indiana. Services include: Selective Demolition Structural Demolition Asbestos Abatement Mold/Lead Remediation Junk Removal

Gump Demolition, LLC provides demolition and abatement services to Ohio, Kentucky, and Indiana. Services include: Selective Demolition Structural Demolition Asbestos Abatement Mold/Lead Remediation Junk Removal





American Clean & Seal Inc

4469 Bragdon St
4.79(
38
)

American Clean & Seal Inc

4469 Bragdon St
4.79(
38
)
Customers say: Super punctual
Recommended by 94% of Angi customers
Recommended by 94% of HomeAdvisor customers

10 employees, no sub-contracting of work. Cost is determined by the specific job, we strive to give a fair price for professional and long lasting results. Travel charges may apply.

"American clean and seal did a great job and used a superior product to seal . I have noticed my neighbors use other companies and their Concrete is now discolored . I would highly recommend !"

Naeem B on August 2018

10 employees, no sub-contracting of work. Cost is determined by the specific job, we strive to give a fair price for professional and long lasting results. Travel charges may apply.

"American clean and seal did a great job and used a superior product to seal . I have noticed my neighbors use other companies and their Concrete is now discolored . I would highly recommend !"

Naeem B on August 2018


"We regret placing our order with Pella Cincinnati, and hope that this review helps you to avoid our mistake. In September, 2021, we ordered a replacement front door and large arched window (73” x 75”) above it from Nikki M., with an estimated install date of January, 2022. Final measurements for the window was done from the top of a ~6’ ladder, for a window placed above the entry door in a two-story open foyer. Installation was pushed back to late February due to manufacturing delays. As that date approached, it was pushed again because the door had still not been received. From March - April, we called a week or so after each door delivery date had passed, only to receive a new, more delayed date. In May, we requested that the window be installed, given the door’s unending delays. This was scheduled for June, 2022. The crew arrived as scheduled, and removed the old window from our home. They then installed the new window, only to discover that it was not the correct dimensions. Tommie M., a Retail Installation Manager, was called out to the house to give us our options: accept the window which had a very different arch to it than all the other arched windows on the front of our house, or have them make a template from the old window they’d removed and manufacture a new one (likely with a similar manufacturing timeline.) Given how off the arch of the new window was (more than 4” gaps on either side of the arch) we elected to have the correct window manufactured. This seems to have annoyed the install crew, who shifted from carefully centering the new window to nailing it in and sealing up the holes with spray foam, insulation, and tape. Following this installation, I’ve contacted Pella on June 17, and July 15, and have been told that the template was sent to the factory for engineering confirmation, a prerequisite for placing the order, and that there’s nothing they can do to accelerate the process. Status update calls placed on July 1, 29, and August 8 have simply not been returned. We’re now over 11 months from the time we signed the purchase agreement, with neither component successfully installed. While we understand that COVID-19 has impacted manufacturing timelines, there’s little excuse for the lack of communication from Pella Cincinnati staff, the utter lack of urgency in correcting their errors, and the complete disregard for the fact that the front of our home looks like a contractor abandoned the job mid-install, which is effectively what Pella Cincinnati has done. Save yourself some frustration, and order your doors and windows elsewhere."

Kevin R on August 2022

SHOWROOM LOCATIONS; *MONTGOMERY, OH 9869 Montgomery Road

"We regret placing our order with Pella Cincinnati, and hope that this review helps you to avoid our mistake. In September, 2021, we ordered a replacement front door and large arched window (73” x 75”) above it from Nikki M., with an estimated install date of January, 2022. Final measurements for the window was done from the top of a ~6’ ladder, for a window placed above the entry door in a two-story open foyer. Installation was pushed back to late February due to manufacturing delays. As that date approached, it was pushed again because the door had still not been received. From March - April, we called a week or so after each door delivery date had passed, only to receive a new, more delayed date. In May, we requested that the window be installed, given the door’s unending delays. This was scheduled for June, 2022. The crew arrived as scheduled, and removed the old window from our home. They then installed the new window, only to discover that it was not the correct dimensions. Tommie M., a Retail Installation Manager, was called out to the house to give us our options: accept the window which had a very different arch to it than all the other arched windows on the front of our house, or have them make a template from the old window they’d removed and manufacture a new one (likely with a similar manufacturing timeline.) Given how off the arch of the new window was (more than 4” gaps on either side of the arch) we elected to have the correct window manufactured. This seems to have annoyed the install crew, who shifted from carefully centering the new window to nailing it in and sealing up the holes with spray foam, insulation, and tape. Following this installation, I’ve contacted Pella on June 17, and July 15, and have been told that the template was sent to the factory for engineering confirmation, a prerequisite for placing the order, and that there’s nothing they can do to accelerate the process. Status update calls placed on July 1, 29, and August 8 have simply not been returned. We’re now over 11 months from the time we signed the purchase agreement, with neither component successfully installed. While we understand that COVID-19 has impacted manufacturing timelines, there’s little excuse for the lack of communication from Pella Cincinnati staff, the utter lack of urgency in correcting their errors, and the complete disregard for the fact that the front of our home looks like a contractor abandoned the job mid-install, which is effectively what Pella Cincinnati has done. Save yourself some frustration, and order your doors and windows elsewhere."

Kevin R on August 2022

Lead Testing and Removal questions, answered by experts

Government regulations such as the EPA and OSHA govern lead removal procedures to ensure health and environmental safety during and after abatement.

With regular testing, treatment, and maintenance, water from a community well should be safe to drink. Unfortunately, the EPA does not regulate private wells, and contamination can happen. 

If you have doubts about the quality and safety of your drinking water, you have options for testing. You can pick up kits from your local home supply store or harvest samples and send them to a local testing facility. To get the most complete water quality testing and system diagnosis, seek a local well professional. They know what to test for and can recommend and implement a longer-lasting solution.

Services test for allergens, mold, VOCs, and carbon monoxide levels to ensure a healthy indoor environment.

A professional indoor air quality inspection takes anywhere from one to three hours, depending on the size of your home and the number of necessary samples. After the test, the specialist will discuss the findings, but you won’t get a full written report for 2 to 10 days, though you can ask your pro to expedite the process, if needed. 

If your house was built before 1978 and you’re noticing cracking or peeling paint, a lead paint inspection is a good idea. A lead paint inspection gives you accurate information about the presence, location, and condition of lead-based paint in your home. This information is essential for making informed decisions about lead paint removal to ensure your safety and health and that of your family. If your inspector finds lead, you’ll need to take steps to manage or remove the lead-based paint and comply with laws and regulations.

By submitting this question, I acknowledge and agree that Angi may publicly display my name, city, state, and question on the website for professionals and others to see.

The Glencoe, KY homeowners’ guide to lead testing and removal services

From average costs to expert advice, get all the answers you need to get your job done.