Top-rated subcontractors.

Get matched with top subcontractors in Arlington, KY

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Arlington, KY?

Select your specific project to find the pro for you.

TRUSTED BY ARLINGTON, KY HOMEOWNERS

  • Average homeowner rating star icon4.4
    Average homeowner rating
  • Verified reviews icon17
    Verified subcontracting services reviews

Find Subcontractors in Arlington

Avatar for Taylor's Home Haven LLC
Taylor's Home Haven LLC
4.5(
10
)
Major Home Repairs (General Contractor)

Serving Arlington, KY and surrounding areas

Approved

In business since 2018

Free estimates

Emergency services offered

"The job was completed on schedule, with some long nights put in. My wife has hardly left the porch since they screened it in. Customer service was without compare. A more energetic team would be hard to come by."
Bathroom remodel
Bathroom remodel
Bathroom remodel
18 neighbors recently requested a quote
Recommended by66%of homeowners
The Lawnfather
4.9(
8
)
Major Home Repairs (General Contractor)

Serving Arlington, KY and surrounding areas

In business since 2023

Free estimates

Warranties offered

"I had a giant pine tree that I have been wanting to get down for a long time now. I called several companies that said they would show up but no one ever did. I called the Lawnfather, they were very prompt with scheduling. Not only were they responsive with their phone call but very responsive with showing up to give us a quote. They were prompt reliable and and very affordable. I would highly recommend them and plan on using them again."
Response time4 days
Response rate97%
Recommended by85%of homeowners
Avatar for Potter House Group Inc
Potter House Group Inc
4.4(
12
)
Major Home Repairs (General Contractor)

Serving Arlington, KY and surrounding areas

In business since 2003

Emergency services offered

Credit card accepted

"For the second time we are so pleased with our recent contract with Potter House Group.  Our first experience with Potter House Group was a new build construction project.  They found us a lot and built us a custom home about 9 years ago.  Since then we relocated into a 115 year old home and we hired them for our kitchen remodel.  First we did our research, and we sought bids from several contractors.  Potter House Group once again had a competitive quote, that we felt had all the "bases" and potential "surprises" covered.  We also felt that the allowances that were allotted in our estimate allowed us to select quality selections for the fixtures, granite, cabinetry & flooring.  What impressed us the most is that once again we worked directly with the owner, Lee, for the duration of the project.  From the very beginning, Lee was professional, honest, and extremely efficient with our time.  Our kitchen was completely gutted down to the bare studs, removing of walls, flooring, electric, and a back staircase.  When you are without the hub of your home-the kitchen-meeting timelines is very important.   They met all timelines and brought in the necessary resources and tradesmen to perform various scopes of work.  All the inspections that were needed went well too.  Lee addressed any questions or concerns we had during the process responsively.  Without a doubt, Potter House Group will be the contactor we use for the next job.  We are already dreaming of our next project, a master bath addition.  Can?t wait!  Potter House Group is highly recommended!!!
Thank you Lee for a beautiful kitchen!"
Additional Photos
Additional Photos
Additional Photos
Recommended by100%of homeowners
Showing 1-10 of 31
Subcontractors questions, answered by experts

Costs depend on project complexity, materials, labor, permits, and required revisions.

You can draw your own house plans using three-dimensional modeling software, but in most cases, you’ll need an architect to draw up the final plans. Architects understand local building regulations and requirements, so their plans will be necessary for getting permits approved, and they’ll also ensure your home is structurally sound. DIY house plans can be a good place to start to help visualize your project, but you should always defer to a professional before trying to proceed with the project.

Above all, the downside to building a new house is a longer timeline. You need several months to finish the build, depending on the supply chain and labor availability in the meantime. Building a home compared to buying one is also more expensive, both in the building process and when it comes to mortgage rates and property taxes.

Blueprints are generally available for houses built after the early 1900s. Before then, detailed building schematics like blueprints were rarely used and even more rarely saved. If you have an older house and need blueprints, you can have a new set drawn up by an architect or draftsperson.

The process typically takes 2-6 weeks, depending on the project size and level of customization.

The Arlington, KY homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.