Top-rated subcontractors.

Get matched with top subcontractors in Highland, KS

Enter your zip and get matched with up to 5 pros

Need a pro for your subcontracting project in Highland, KS?

Select your specific project to find the pro for you.

TRUSTED BY HIGHLAND, KS HOMEOWNERS

  • Average homeowner rating star icon4.6
    Average homeowner rating
  • Verified reviews icon15
    Verified subcontracting services reviews

Find Subcontractors in Highland

Avatar for Vantage Point Exteriors
Vantage Point Exteriors
3.8(
122
)
Major Home Repairs (General Contractor)

Serving Highland, KS and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"Owners of Vantage Point Exteriors were very pleasant; good professional sales pitch; agreed to meet lowest bid; 100% satisfaction guaranteed. 
New roof installed on May 9 and looks great.  To date, there have been zero problems and I've had some very heavy rains in my area, no leaks.  But, there was a fair amount of sharp metal debris (roofing nails and staples) left around perimeter of house, patio, driveway and in garden areas.  Had heavy-duty roof staples penitrate the bottom of my sneakers a couples of times, so be very careful around children, pets, tires, and barefeet. 
New non-clog gutter system installed May 10-11.  Looks great and color was excellent match to exterior house paint.  Was told that if there were any problems, the system was 100% guaranteed against leaks/problems.  Experienced a problem with one corner piece and rain run-off was creating a small mud hole, so I called the gutter sub-contractor (he gave me his business card and said to contact him directly if there were any problems); however, I had a very hard time reaching him--and sent a follow up message call/e-mail to Vantage Point owner.  Next afternoon, subcontractor still had not bothered to contact me about a return service appointment date/time.  I'm 55 years old and admit that I'm "old school" about customer service and keeping promises made to clients, especially after spending a substantive amount of money, so I was a bit put-off and frustrated by lack of communication and sent a second pointed e-mail to Vantage Point owner describing my dissatisfaction.  This resulted in an immediate response and apologies from the owner and subcontractor; problem was fixed that evening; has rained hard since and no further problems experienced with rain-off from that corner piece. 
"
Additional Photos
Before Vantage Point got the call
Another happy homeowner!
Before Vantage Point got the call.
Another happy homeowner!

+38

Recommended by73%of homeowners
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Major Home Repairs (General Contractor)

Serving Highland, KS and surrounding areas

In business since 2006

Credit card accepted

"The man I talked to was very professional and timely. However, he explained that this particular job was beyond the scope of what their company does. I would certainly use them on another 'issue'.
"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Showing 1-10 of 22
Subcontractors questions, answered by experts

Designs typically take 2-6 months, depending on factoring, project size, and customization needs. Larger or more complex designs may require additional time for approval and revisions.

Costs vary depending on project complexity and scope. Architects generally charge a percentage of the total budget or an hourly rate for their services.

New constructions, renovations, and interior layouts benefit from expert drafting.

Absolutely! You can tailor the design to meet your specific needs and preferences. Whether it's adding amenities, adjusting dimensions, or choosing different materials, customizing your storm shelter ensures it suits your family's requirements and offers the utmost comfort and safety during severe weather. So go ahead and create a shelter that perfectly fits your unique needs!

Buying a house is easier than building one from scratch. Buying an existing home is almost always faster, even if you need to make renovations once you move in. When you hire the right team to build a home, they will simplify the design and build phases so that there is little guesswork throughout the process, but building new construction will almost always take longer than buying an existing home.

The Highland, KS homeowners’ guide to subcontracting services

From average costs to expert advice, get all the answers you need to get your job done.