Top-rated home builders.

Get matched with top home builders in Markleville, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your home building project in Markleville, IN?

Select your specific project to find the pro for you.

TRUSTED BY MARKLEVILLE, IN HOMEOWNERS

  • Average homeowner rating star icon3.8
    Average homeowner rating
  • Verified reviews icon12
    Verified home building services reviews

Find Home builders in Markleville

Shed Doctor
4.9(
66
)

Serving Markleville, IN and surrounding areas

Approved

Free estimates

Small jobs welcome

Offers commercial services

"I asked Shed Doctors for a quote to build an large outdoor structure. John responded quickly. In looking at the project closely, it was determined to not be a good fit. Rather than try to bid and take on the project anyway, John was upfront and honest. While this project didn't happen, I will definitely reach out to Shed Doctors in the future for any projects that I believe could align."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+11

3 neighbors recently requested a quote
Recommended by96%of homeowners
Avatar for Maynor Construction, LLC
Maynor Construction, LLC
4.3(
38
)

Serving Markleville, IN and surrounding areas

Approved

In business since 1995

Free estimates

Emergency services offered

"Good people and great work with the re-mulching of our property. Very conscientious. They trenched around the entire house, used quality mulch, and made the home look better than the work done three years ago where we had paid nearly twice the price to another company."
Sunroom 2
Sunroom 1
Screened In Porch 1
Screened In Porch 2
Sunroom & Screened Porch

+41

Response time2 days
8 neighbors recently requested a quote
Recommended by96%of homeowners
Ascended Constructions
New to Angi

Serving Markleville, IN and surrounding areas

Approved (Corporate)

In business since 2023

Offers commercial services

We’re a family owned and operated company that values honesty and integrity, and stands behind our work. We offer over 40 years of industry experience. We specialize in Asphalt Shingle Roofing installation, replacement, and repairs. Our services are customized to the individual project, paying close attention to the details of each project that we're involved with. We look forward to building long-term relationships with our clients and guarantee your satisfaction!

1 neighbors recently requested a quote
Avatar for Jersey Construction
Jersey Construction
4.4(
169
)

Serving Markleville, IN and surrounding areas

In business since 2012

Free estimates

Emergency services offered

"He replaced some cedar on my box window. What I liked is I called for something that didn't need to be done. He said that wasn't needed and he could have told me it did. He said that it just needed to be caulked. I appreciated his honesty. He checked my whole house for wood rot. He explained everything first before doing the work. He gave me the receipt for the boards I purchased so I could get my money back from Lowe's."
Recommended by82%of homeowners
Avatar for Greg Kearns Builder/Designer
Greg Kearns Builder/Designer
4.5(
158
)

Serving Markleville, IN and surrounding areas

In business since 1980

Free estimates

Credit card accepted

"Room addition; Greg was responsive and resolved all issues raised. Greg is professional and respectful. I only gave a quality rating of B because I felt that the crew needed a little more closer oversight, I suggested this to Greg and he was receptive. The work was completed promptly, and I will definitely consider Greg for my future projects.
"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+5

Recommended by89%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Markleville, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
SMALLING CONSTRUCTION
4.2(
25
)

Serving Markleville, IN and surrounding areas

In business since 1996

Emergency services offered

"HOWEVER, he found a company in OH that could create a textured brick and then found a company in northern IN who came and hand stained every brick to match our existing brick.  If you didn't know our home had damage, you wouldn't be able to tell.  They did a beautiful job.  The reno took longer than I thought it would, but they had to find the brick and I know that was a chore. Plus to get on the schedule of the brick painters. Great workers and great job.  .  
"
Recommended by78%of homeowners
...
Showing 1-10 of 96
Home Building questions, answered by experts

Renovating or remodeling an existing structure is usually less expensive than the cost to build a new house. That’s because you can save on the costs of new building materials, laying a foundation, framing the entire building, and installing new materials and utilities throughout the house. However, if a home is in very poor condition or is incredibly old, you could spend more on upgrades and restoration compared to building from scratch.

Modular homes are a type of prefab home. Specifically, manufacturers first build modular homes in sections and then deliver them to the job site. The modules, or sections, are usually at least 70% finished before they arrive on your property.

In comparison, prefab homes arrive in panels or segments, and workers assemble them on-site. Generally speaking, modular homes tend to be more durable, and their consistent construction standards may mean you’ll have an easier time getting conventional home loans.

The term “cottage” is subjective, so there’s no rigid definition, but it generally refers to a small home with simple and purposeful architecture that embraces nature and focuses on charm over everything else. Cottages are typically 1 or 1 1/2-stories tall, usually with gabled roofs, and are built out of natural materials that help make the structure a part of the surrounding nature rather than something that stands out from it. A big part of what makes a cottage a cottage is the decor, which includes natural materials from the nearby area.

Building a house without blueprints is not advised. It will prevent you from obtaining necessary building permits and meeting building codes and is likely to result in shoddy construction and unsafe living conditions. Detailed blueprints ensure that a house is built to exact specifications and is constructed safely and structurally stable.

Builder-grade is one of two types of stock cabinets, whereas semi-custom designs allow homeowners some control over the color, finish, or hardware on their cabinets. Stock cabinets are sold in construction-grade and builder-grade designs. Construction-grade cabinets are usually made from inexpensive medium-density fiberboard, which is prone to moisture damage, whereas builder-grade models are a step up with higher-quality materials. Construction-grade designs are the most common type of cabinets in America.

The Markleville, IN homeowners’ guide to home building services

From average costs to expert advice, get all the answers you need to get your job done.