Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Butlerville, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Butlerville, IN?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Butlerville

Mobile Welding
New to Angi
Gate for Driveway or Security - Install or Replace

Serving Butlerville, IN and surrounding areas

Approved

About Me\nHi, I’m a certified mobile welder and fabricator with years of hands-on experience working with steel, aluminum, and stainless. I specialize in custom fabrication, automotive welding, heavy equipment repair, and structural work. Whether you need a small repair or a fully custom build, I bring quality workmanship, attention to detail, and a commitment to getting the job done right the first time.\n\nI’m reliable, mobile, and can come to you with all the equipment needed to complete your project safely and efficiently. I take pride in delivering strong, clean welds and professional results every time.\n\nIf you’re looking for someone who’s dependable, skilled, and easy to work with, I’d be happy to help with your next project.

...
Showing 1-10 of 110
Asphalt Driveways questions, answered by experts

It takes recycled asphalt 48 hours to initially harden and up to 3 months to fully cure. It’s best to stay off of recycled asphalt for at least 48 hours, then you can walk or drive standard vehicles on it. Hold off on driving heavy trucks or equipment on it for at least 7 days. Allowing the surface to melt together and harden ensures that the surface stays durable and long-lasting. 

When hiring an asphalt paving contractor to install your driveway, ask as many questions up front as possible. Here are a few questions to ask a prospective driveway contractor:

  • How many years of experience do you have?

  • Are you licensed, bonded, and insured?

  • Do you have worker’s compensation?

  • Do you use subcontractors on your projects?

  • Do you clean up after the job is done?

  • Who is responsible for any damage to lawn or landscaping?

  • Do you provide a guarantee or warranty on your work?

  • Do you give free estimates?

  • What is the timeline for completion?

  • How do you handle change orders?

  • Can you provide at least three references?

  • Can I see some of the work you’ve done?

DIY is not recommended due to equipment and expertise requirements. Professional services ensure durability and proper grading.

New asphalt typically needs 24 to 72 hours to dry before it can handle light foot traffic and careful driving. Although it may appear solid after a few days, the full curing process, where the asphalt reaches its peak strength, takes much longer—generally from 30 days to a year.

During this extended curing time, the surface remains relatively soft and can be damaged by heavy vehicles, sharp objects, or high temperatures. To protect your investment, it's best to avoid parking heavy machinery on the asphalt until it has fully cured.

The exact time required for drying and curing depends on several factors, including the weather, the specific asphalt mix, and its thickness. For the most accurate advice tailored to your situation, consult with your asphalt contractor.

The cost to pour a driveway apron depends on the material and size. Concrete costs $3 to $10 per square foot, asphalt ranges from $2 to $5, and pavers are $5 to $15 per square foot. Additional expenses, like excavation, base material, and labor, can increase the total cost. For example, a standard 12x15-foot concrete apron could cost between $540 and $1,800, depending on local rates and additional work required. Always consult a local driveway paving contractor to get an accurate estimate tailored to your project.

The Butlerville, IN homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.