Top-rated pole barn builders.

Get matched with top pole barn builders in Bloomfield, IN

Enter your zip and get matched with up to 5 pros

Need a pro for your pole barn building project in Bloomfield, IN?

Select your specific project to find the pro for you.

Find Pole barn builders in Bloomfield

Avatar for White River Handyman
White River Handyman
5.0(
8
)

Serving Bloomfield, IN and surrounding areas

Approved

In business since 2023

Free estimates

Warranties offered

"went great Galen was wonderful and very professional. the repair he did on my doors that the dog destroyed was amazing. He worked hard the entire time he was here."
Additional Photos
Additional Photos
Additional Photos
3 neighbors recently requested a quote
Recommended by87%of homeowners
Avatar for Schriber's Flooring LLC
Schriber's Flooring LLC
4.8(
52
)

Serving Bloomfield, IN and surrounding areas

In business since 2009

Free estimates

Credit card accepted

"Couldn't have asked for a more reputable business to do the job! We appreciated the fact that Trey and his crew communicated with us throughout the entire duration of the project. They came across an issue in the floor we talked about it and the correct way to fix the issue. We made the choice to redeck the floor to have it done right for the long haul! Trey and his crew created exactly what we wanted! Thank you for your hard work, dedication, and honesty! We look forward to hiring you to do the downstairs next!"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+64

Recommended by97%of homeowners
Avatar for Legacy Window & Door LLC
Legacy Window & Door LLC
4.1(
151
)

Serving Bloomfield, IN and surrounding areas

Free estimates

Emergency services offered

Credit card accepted

"After receiving a few other estimates on a sunroom addition plus a screened in porch, we decided to go with Legacy Windows. Mark’s estimate was in the middle of the other estimates and he offered much more flexibility than the other companies we spoke to in terms of customization. He is a great salesman with previous marketing experience. We signed our contract on April 10th. We were told that Mark and his crew were finishing a room and would be able to start in 2-3 weeks with a timeframe of 6-8 weeks for completion of our room addition project. The budget and timeframe worked well for us, so we decided to add replacement windows for the rest of our house (11 windows total). Several weeks went by and our project had not yet started so we followed up with Mark. We were told that there were issues with his current project (did not pass inspection) and it would push our start date back due to the workmanship repairs. During this time period before any work began on our project we would communicate often with Mark to check on the status of our project. The really frustrating thing about working with Mark is his inability to fulfill commitments he would make to us in regards to project timing and when things would be done. Our primary communication with him was via text messages and time after time he would tell us, “we should be starting next week” or “we are going to be making up for lost time quickly” and time would pass and it just wouldn’t happen. Work on our project began when our existing windows were replaced in early June. The foundation for the expansion was finally started in late June and framing started in early July (roughly 3 months after signing the contract). The first crew completed the framing, hired the shingles out, installed some of the cedar siding, and installed one wall of windows. We were seeing decent progress after having such a long wait in the beginning, all the while the commitment issue just kept popping up. We would get a text saying something like, “going to be at the house tomorrow with some stone samples” and he wouldn’t show up. It was annoying, but progress was being made and we were happy with how the expansion was taking shape so we were willing to overlook it. Sometime toward the beginning of August (roughly 4 months after signing the contract), work just stopped. Again, when we would reach out to Mark asking about the status of our project we would be told, “I’ll have an action plan later this afternoon” or “we want to get everything we done we can this week” or “the crew will be there tomorrow and we will be working all week on your project trying to finish”. In the meantime, nothing would be done and we would repeat the process. This went on for over 3 weeks, during this time there was absolutely no work done. Large piles of construction trash and building materials sat in our yard during this time. A great deal of the usable wood began to warp and I am sure that ultimately materials had to be tossed from being left in the elements for so long. After a couple weeks I finally moved a significant portion of the usable wood up onto the deck so it would at least be partially protected. We found out that there was an issue with the electrical and Mark had decided to let Crew #1 go as they were not meeting his expectations, but it was not communicated to us until the end of the over 3 week period. A second crew then arrived who Mark said usually only did work for him on the south side of Indy (we live in Lebanon), but he wanted to get our project back on track. There seemed to be little to no communication between the crew and Mark on what they were supposed to work on so we had to explain to them what was in the contract to be completed. Crew #2 also started making good progress, they finished the cedar siding, got the rest of the windows installed in the sunroom as well as installing the sunroom ceiling. About this time, which was at the beginning of September we had a separate crew come out to do the drywall. Mark recommended them very highly. As it turned out, the drywall was not properly installed or insulated (in some walls there was no insulation), and ultimately it had to be taken down and redone by Crew #2. Crew #2 seemed to be doing a really good job and we were quite pleased with their progress and the quality of work they were doing for us. They were replaced by Crew #3 sometime in mid-September. We were never told why they were replaced, but Crew #3 was much closer to where we lived so I assume that had something to do with it. Much like when Crew #2 started, there seemed to be little communication between Crew #3 and Mark on what they were supposed to work on. So we again had to explain what was in the contract to be completed. All through the process, the commitment issues mentioned previously continued. We were not as happy with the quality of the work done by Crew #3 as we had been by Crew #2 (or even Crew #1), but they did finally complete for the project for us and after (3) failed attempts we finally received a pass from the building inspector on his final inspection. When Crew #3 decided they were finished they never came back, we communicated multiple times with Mark about the remaining punch list items to no avail and ultimately decided to finish most of the small punch list items ourselves instead of waiting any longer for them to finish (clean up, sanding / finishing drywall, etc.). We love the way the sunroom and covered porch area turned out. From contract signing until the end it took a little over six months, but in Mark’s defense he did agree to let us add a brand new window in the dining room of our house to tie everything together at no cost to us as appreciation for our patience. There are things that we liked about Mark’s company and things we didn’t, I have tried to summarize each category as follows: Positives • Price seemed reasonable • It is truly a custom build, no problem with changes we had at any point • Love the way it turned out, looks amazing • Mark seemed to genuinely care about the quality of the product he was delivering to us (he replaced the cedar shakes that had been installed by Crew #1 because he wasn’t happy with the quality Negatives • Our project seldom felt like it was a priority, part of the reason it took so long was because they were over committed on other projects • Commitment Issues (addressed previously) • Construction Trash left in our yard for months • We cleaned up inside more than they did, I understand drywall work is messy. They never swept up any of the dust and they didn’t clean up any of the clumps of dried drywall mud all over the floor. • We finished some of the minor punch list items, just to be done."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+70

Recommended by84%of homeowners
Avatar for WorkWithMeNotAgainstMe
WorkWithMeNotAgainstMe
4.8(
9
)

Serving Bloomfield, IN and surrounding areas

In business since 2018

Free estimates

"These guys were great!! We had a delivery of a massive new front, all in one piece, very heavy. They handled it of total care and stored it in our garage with all the very long trim pieces for installation next day. Kind of an unusual item to deliver so was concerned about the glass, scratching, damage. Again, 5-star handling and very pleased!!"
Delivery
Delivery Service Project
Handymen Project
Moving Companies Project
Moving Companies Project

+15

Recommended by80%of homeowners
Avatar for Flawless Flooring Plus
Flawless Flooring Plus
5.0(
5
)

Serving Bloomfield, IN and surrounding areas

In business since 2005

Free estimates

"

Flawless Floors far exceeded my expectations on not only the quality of their work but also their price. Francis Blair and his team did drywall work for me as well as tile work in my bathroom and laundry room.   He was very timely, organized, and had the necessary tools to do a flawless job.  This company puts their customers first. For example, they worked late hours and went out of their way to help us get re-situated into our home.  I am extremely thankful that I hired this company to do my work and will definitely be using them in the future.


"
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+26

Recommended by100%of homeowners
Decks Plus By Greywolf
5.0(
2
)

Serving Bloomfield, IN and surrounding areas

In business since 1996

Free estimates

Emergency services offered

"The whole project was planned, scheduled, and completed very well.  

Decks Plus owner, Mr. Sira, kept all appointments during the project.  He converted a rough concept into a detailed plan, described what he would do, and did what he promised.  This was accomplished with a simple contract only.

Sira and his team were unobtrusive in their work habits.  They were neat in the arrangement and storage of building materials and tools and they kept the work area tidy and organized.  

Weather intruded only slightly during the work, even though April weather is not exactly predictable.  The project entailed work over several days, encompassing perhaps two weeks from start to finish with weather interruptions.

I rate the price for the job as "good" instead of "excellent" for the simple reason that I had nothing with which to compare.  During my initial consultation with Mr. Sira, I concluded that he was honest, competent, and committed to the quality of his work.  He gave me an estimate, and I accepted it.  I have no regrets about it and an quite pleased with the work and its performance."
Recommended by100%of homeowners
...
Showing 1-10 of 58
Pole Barn Builders questions, answered by experts

Whether you should choose a flat roof or a sloped roof depends on your particular situation. Flat roofs tend to be less expensive to install. However, sloped roofs have longer lifespans and stand up better to heavy snow and other inclement weather.

Keep in mind that even a flat roof needs to have a slight slope, usually around 1/2 inch for every foot. If it is completely flat, water will pool and cause damage, either from weight or leakage or rot.

A simple A-frame chicken coop can take as little as three hours to build, but a more substantial all-in-one coop to house a large flock can take four or five days to build. Consult a local handyperson or custom coop builder for a time estimate based on the specific details of your project.

Whether a prefab home is worth it or not will depend on your personal needs and preferences. Overall, prefab homes tend to cost less than traditional homes, although they also tend to have lower resale values. Another thing to consider is that prefab homes usually last 50 to 60 years or longer, while traditional homes last 50 to 100 years or more.

It is recommended that you check with your local building official on barn building requirements and rules, since size restrictions vary greatly from region to region based on what your property is zoned for. Some cities limit barn construction depending on if your property is residential or commercial. The three main factors your building commission will evaluate are:

  • Height and lot coverage: How tall your barn is and how much of your total property it occupies

  • Setback: Distance between barn and property line

  • Easement: Legal right for another owner to access another’s property

Building a barndominium means converting a barn into a house. Barndominiums are becoming popular as spacious and stylish alternatives to typical housing structures. Old barns that become houses traditionally consist of wooden construction. However, newer structures, such as pole barns, often contain metal exteriors and roofs. Converting a metal outbuilding into a house presents an excellent opportunity to create a barndominium from metal.

The Bloomfield, IN homeowners’ guide to pole barn building services

From average costs to expert advice, get all the answers you need to get your job done.

  • Farm blue barn shed and gravel driveway.

    If you’ve ever wondered what precisely a pole barn is, you’re about to find out. Not many know the advantages and disadvantages to the cost, construction style, and flexibility of building one on your own or hiring a contractor for the job.

  • framework of building a farm

    Learn how to hire a barn builder with expert guidance on finding qualified pros, asking the right questions, and ensuring your barn project succeeds.