Top-rated basement remodelers.

Best basement remodelers near Kirkland, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Kirkland, IL?

Select your specific project to find the pro for you.

Top-Rated Basement remodelers in Kirkland - Updated Nov 2026

Avatar for Klock Home Services
Klock Home Services
New to Angi
Basement - Remodel

Serving Kirkland, IL and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

Hi, I’m Kevin with Klock Home Services, proudly serving the Fox Valley area. I provide reliable, detail-oriented handyman and home repair services at fair prices. From furniture and drywall repair to minor carpentry, fixture installs, and general maintenance, I treat every project like it’s in my own home. Whether it’s a small fix or a larger task, you can count on quality work done right the first time.

Avatar for Castle Construction
Castle Construction
4.9(
9
)
Basement - Remodel

Serving Kirkland, IL and surrounding areas

Free estimates

Credit card accepted

"We called, Alex came out that afternoon, had a bid the next day for the screening. The next day he had a bid on the chimneys. He and a partner began the work and finished in a week. They cleaned up each day, and hauled away trash. Very nice to work with and very thorough. Yes, I would hire again."
Kitchen and Bath Remodeling Project
Remodeling - Kitchen & Bathroom Project
Decks and Porches Project
Landscaping Project
Kitchen and Bath Remodeling Project

+64

Recommended by100%of homeowners
Avatar for Granados Construction Co
Granados Construction Co
5.0(
7
)
Basement - Remodel

Serving Kirkland, IL and surrounding areas

In business since 2005

Free estimates

Small jobs welcome

"Granados construction company did my roof in a timely and professional manner. The owner Francisco is very knowledgeable, and always responded to my questions and concerns immediately. I would 100 percent hire this company again for any of my future renovation. Granados construction company's work is top tier quality."
Response time7 hrs
Response rate92%
...
Showing 1-10 of 95
Basement Remodel FAQs, answered by experts

Some older homes have toilets in the basement to combat sewage backups. This type of toilet, also known as a Pittsburgh potty, acted as a safety valve over the incoming sewer line. If a line backed up, it would back up into the toilet because it was the lowest fixture in the home, keeping it out of sight and away from the finished areas of the house.

Basement toilets were also used by workers with messy jobs, like those who worked in coal mines or steel mills. This way, they could clean up and avoid tracking dirt through their home.

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

In many homes, an unfinished basement is an ideal place for an in-ground pool. The concrete floors, protection against water damage, and access to the ground below your home make this a large contender. Speak with a local basement remodeling contractor to ensure your space is right for the large construction.

A walkout basement is considered to be partially below grade because at least one wall is entirely exposed. In some cases and in specific municipalities, inspectors and appraisers will still count walkout basements as below grade, which means the space can’t serve as living space or be rented out. If you intend on using the area as living space or a separate apartment, you should check with your local building department to make sure it’s legal to do so.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

The Kirkland, IL homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.