Top-rated excavation pros.

Get matched with top excavation pros in Carrollton, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Carrollton, IL?

Select your specific project to find the pro for you.

Find Excavation pros in Carrollton

Avatar for Empire stone & hardscape
Empire stone & hardscape
New to Angi
Landscape - Minor Grading or Resloping

Serving Carrollton, IL and surrounding areas

Approved

Free estimates

🏗️ Empire Stone & Hardscape\n🧱 Paver Patios • Retaining Walls • Walkways\n🔥 Fire Pits • Outdoor Living • Landscaping\n💪 15+ Years of Experience\n📍 Serving Wentzville & Surrounding Areas\n⭐ Quality Work. Built to Last.\n📲 Message us today for a FREE estimate!

Showing 1-10 of 50
Excavating questions, answered by experts

You do not have to dig footers for a deck as long as it meets local code and holds up to weather in your area. If you live somewhere that experiences high winds and earthquakes, you may need to dig for your deck posts. Deck blocks, post anchors with base plates, and helical pile systems are the three no-dig deck post options you can choose from if local code permits.

Hardscaping often requires preparation of the ground in the area where the feature is being installed. This can include digging, compacting, and leveling the soil, ensuring adequate drainage, and removing any existing plants. The extent of preparation needed will depend on the type and size of the hardscaping feature being installed.

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

Professional installers often include a deep layer of crushed gravel under permeable pavers to allow more runoff to soak through into the soil below. Many installations will include multiple layers of gravel, with coarser aggregate at the base and finer aggregate that sits on top of that bottom layer. Above the gravel, you’ll often find coarse sand that helps reduce paver shifting over time. Some permeable paver designs include a water collection system set into the gravel layer to route runoff to a safe area for disposal.

No, a ditch isn’t a trench. A ditch is an open, relatively shallow channel that’s carved out of the ground and used for drainage purposes. In contrast, a trench is a deeper excavation that’s entirely underground. Trenches have many uses, including gas lines, sewage systems, and electrical wiring. Unlike trenches, ditches don’t get filled back in with dirt after they’re dug.

The Carrollton, IL homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.