Top-rated excavation pros.

Get matched with top excavation pros in Carrollton, IL

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Carrollton, IL?

Select your specific project to find the pro for you.

Find Excavation pros in Carrollton

Avatar for Empire stone & hardscape
Empire stone & hardscape
New to Angi
Landscape - Minor Grading or Resloping

Serving Carrollton, IL and surrounding areas

Approved

Free estimates

🏗️ Empire Stone & Hardscape\n🧱 Paver Patios • Retaining Walls • Walkways\n🔥 Fire Pits • Outdoor Living • Landscaping\n💪 15+ Years of Experience\n📍 Serving Wentzville & Surrounding Areas\n⭐ Quality Work. Built to Last.\n📲 Message us today for a FREE estimate!

...
Showing 1-10 of 52
Excavating questions, answered by experts

The time it takes to build a pool—and dig out the area—varies based on the pool size and type. A professional excavator will take between four and eight hours to dig a pool. The process will take longer if they encounter large boulders or tree roots. Keep in mind that this is a small part of the process in the long run. You will need between eight and 12 weeks to build a pool from start to finish, including the time to apply for permits.

Almost any kind of home can have a wine cellar or cabinet installed. You’ll need an area where a concrete floor can be put in, along with the necessary insulation, climate control, and ventilation systems. If you think of yourself as an aspiring sommelier, an underground wine cellar may be ideal, but it will cost significantly more. 

What you choose to install really depends on your budget and how many bottles you’re looking to store.

Depending on the severity of the freeze and the method used, thawing frozen underground pipes can take anywhere from 30 minutes to several hours. Applying heat directly to the pipe using heat tape, infrared lamps, or hot water jetting can speed up the process. However, patience and careful monitoring are key to avoiding pipe damage.

Hard soil could be a sign of overly dry dirt, either from poor drainage or drought. It's important to test the nutrient levels, density, and drainage capacity of your soil to see if it's absorbing water properly. Begin by adding a light layer of water and observing how long the soil retains moisture. If you experience a good deal of runoff, you may need to aerate your lawn, apply a wetting agent, or hire a professional for a closer look.

There is no standard depth for burying a septic tank; they are typically buried anywhere from 4 inches to 4 feet underground. The final depth depends on several factors, including the depth of your main sewer line, the height of the bedrock, soil type, local regulations, and the property's landscape. If you plan to grow grass or plants over the tank, a depth of at least 4 to 6 inches is recommended. Deeper tanks can be more difficult to locate, but a septic professional can help find it for you.

The Carrollton, IL homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.