Top-rated rototilling pros.

Get matched with top rototilling pros in Ashton, IL

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Ashton, IL?

Select your specific project to find the pro for you.

Find Rototilling pros in Ashton

Stoll Sales & Construction

No reviews yet

Stoll Sales & Construction

No reviews yet
21 years of experience

For 18 years I was an Outside Sales Representative for nearly all aspects for the building industry. Part of my success was the understanding of how these products worked, were installed and repaired. I have been servicing, repairing and installing every aspect of a home and yard for as long as I can remember. I will work with every customer to meet their needs for their project. Pricing is always fair and negotiable. Since I have sold most everything we would need for your project, I can also help you get the materials at a great price.

For 18 years I was an Outside Sales Representative for nearly all aspects for the building industry. Part of my success was the understanding of how these products worked, were installed and repaired. I have been servicing, repairing and installing every aspect of a home and yard for as long as I can remember. I will work with every customer to meet their needs for their project. Pricing is always fair and negotiable. Since I have sold most everything we would need for your project, I can also help you get the materials at a great price.


Rototilling questions, answered by experts

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

Yes, rain can affect the results of a perc test because it will partially saturate the soil and slow down the rate of drainage. Ideally, you should do a perc test during the driest time of the year and try to schedule it after a stretch of days where no precipitation occurs. This will give you the best chance of passing.

Fixing a depression in your lawn is a DIY for small dips, divots, or slight slopes. You can either remove sod and earth to lower the uneven ground or add premixed topsoil and reseed the lawn to raise it. You can also hire a yard grading company near you for professional help.

Yes, it’s always a good idea to fertilize your lawn before a major leveling project. This step gives your grass the nutrients necessary for healthy growth, helping it recover and replenish itself faster. However, you should do this at least three weeks in advance, as the leveling process can disturb the newly-applied fertilizer.

Typically 1-3 days, depending on property size and terrain condition.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.