"Element Elite did a wonderful job installing a wall cut out pet door in our new home. They were flexible, very easy to work with, confident, trustworthy, and precise. The final cost was also reasonable and matched their estimate quote. I would recommend them to all my family/friends and will use them again myself if other needs arise!"
"We wanted to extend our laminate flooring throughout our first floor. JRH worked quickly, got our old carpet removed, and installed the laminate, meshing into the existing laminate perfectly."
"I have hired Steve Ellis twice. Once was two years ago and the other was just this week. Both times he tore out floor tile that was installed incorrectly and then installed new floor tile. The first time was in the laundry room. Ditra mat was originally under the tile and was not thinset to the floor. So the tile was moving and grout was coming out where the traffic areas were. Tile came up in whole pieces. The second time Steve came he tore up the existing tile in the pantry, spare bath and master bath. All of which was incorrectly installed by someone else. Steve and Jeff installed new tile with backer board underneath. They did an excellent job! It looks beautiful! Very professionally done. I know, now, that my tile will NOT move because it is installed correctly. I would not use anyone else to do any work that I need done. The pricing is fair, the resulting work is excellent and they were on time each day and completed the job when they said they would. I couldn't have asked for a better job from Steve and Jeff. I have had very bad experiences with OTHER contractors in the past 40+ years. So I know a good/excellent job when I experience it."
Been doing remodels and home repairs for 10 years can pretty much do what needs done inside of a home if it is something I’m not comfortable with I will let you know
BullDogz is committed to reliable workmanship, efficient installation, and professional results on every project.\nCore Services\nVinyl plank flooring installation\nGlue-down flooring installation\nNail-down hardwood installation\nUnderlayment installation\nFlooring removal (carpet, vinyl, etc.)\nBaseboard removal and installation\nTrim carpentry\nDoor and window installation\nConcrete grinding and floor prep\nFloor leveling and patching\nGeneral handyman repairs\nFurniture moving for flooring installs
"Showed up before I was off of the phone. Diagnosed the problem and solved it before a tear fell from my face about having to call a plumber on a Monday! "
"Very good experience! Everyone is very nice and punctual. I was given a bid a year ago and was finally able to have the work done. Then kitchen tune up came in this year they were able to match last years estimate. Delivery time frames were very accurate and reasonable. The kitchen was useable everyday during the remodel. I had a cabinet that needed a new bottom, due to having been cut out by a previous owner to accommodate a taller fridge and never had been repaired. The cabinet was rebuilt and works and looks great. I also wanted access to a lazy Susan from the dining side of the kitchen, which was installed beautifully. My back splash isfantastic! I had decided on a tile mosaic, which took some great talent to cut and install. It turned out beautiful."
Backsplash Installation questions, answered by experts
Terracotta tile is a broad term for clay tile that’s been fired in a kiln, and Saltillo tile is a specific type of terracotta tile produced in Saltillo, Mexico. In addition to Saltillo, terracotta tile comes in a range of other shades and styles. You’ll often find it used in buildings throughout Mexico, southern Europe, and the western United States.
It’s important to leave a gap in the corner when tiling to allow room for tile expansion. Leaving between one eighth of an inch to one tenth of an inch is enough space.
Installations typically take 1-3 days, depending on area size; repairs are usually completed sooner if the issue is localized.
On average, tiling a bathroom involves about 12 hours of labor, usually spread over two to three days to accommodate prep work and curing times. A professional tiler can often complete the installation in 6 to 8 hours, whereas a DIYer might take 10 to 16 hours. The total project time is influenced by factors like the bathroom layout, tile type, and necessary prep work, such as removing old tile. The process includes specific timelines for different areas; for example, tiling a floor takes about six hours, while a shower area can take six to ten hours. It is essential to allow for adequate curing time—typically 24 hours each—for the mortar, grout, and caulk, which is why the project extends over several days.
Tile countertops can last up to 100 years when properly maintained. Ceramic and porcelain tiles are the most durable types and can last as long as natural stone countertops like granite, marble, and quartz. Tile countertops are much cheaper than natural stone countertops, making them an excellent option for a homeowner with a limited budget.
The Terreton, ID homeowners’ guide to backsplash installation services
From average costs to expert advice, get all the answers you need to get your job done.
When installing a kitchen backsplash, you’ll need the right tools, materials, and knowledge. Our guide will show you how to install a kitchen backsplash.