Top-rated excavation pros.

Get matched with top excavation pros in Sun Valley, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your excavation project in Sun Valley, ID?

Select your specific project to find the pro for you.

Find Excavation pros in Sun Valley

Avatar for All weather ground solutions llc
All weather ground solutions llc
5.0(
2
)

Serving Sun Valley, ID and surrounding areas

Approved

Free estimates

Emergency services offered

Warranties offered

All Weather Ground Solutions LLC is committed to excellence in every aspect of our business. We uphold a standard of integrity bound by fairness, honesty, and personal responsibility. Our distinction is the quality of service we bring to our customers. Accurate knowledge of our trade combined with ability is what makes us true professionals. Above all, we are watchful of our customers' interests, and make their concerns the basis of our business.

Driveway Upgrade
Circle Driveway
Circle Driveway
Paver Patio
Paver Patio

+1

8 neighbors recently requested a quote
Excavating questions, answered by experts

Septic drain lines (or leach lines) are typically buried between 18 and 36 inches underground, and should be at least 6 inches below the surface. These pipes are perforated and surrounded by filtering materials like sand or gravel. Burying the lines at this depth helps minimize odors and allows bacteria and other biological processes in the soil to effectively treat the wastewater. Burying lines too close to the surface can cause issues unless the soil is very compact and stable.

Yes, most services include site leveling and foundation work. Confirm with your contractor for specifics.

You can dig 60 to 80 linear feet by hand per day depending on the depth. Digging a 100-foot trench by hand will take you two work days, but it can take longer if you have heavy or rocky soil. If you’re digging a deep trench or one that’s over 100 feet, consider renting a mechanical trencher, such as a walk-behind or ride-on, or calling a pro for help. 

You should dig 3 to 6 inches deep for plastic edging. Dig as wide as you need to fit your plastic edging into it—2 inches is usually sufficient.

If you don’t wish to dig it out and convert it into a finished basement, you can still encapsulate your crawl space to protect it from damage for an average cost of $5,500. Finishing a crawl space beyond this isn’t really worthwhile, as the low ceilings mean you won’t be able to use the area as living space.

The Sun Valley, ID homeowners’ guide to excavation services

From average costs to expert advice, get all the answers you need to get your job done.