Top-rated above ground pool installation pros.

Get matched with top above ground pool installation pros in Georgetown, ID

Enter your zip and get matched with up to 5 pros

Need a pro for your above ground pool installation project in Georgetown, ID?

Select your specific project to find the pro for you.

Find Above ground pool installation pros in Georgetown

Avatar for American Home Shield – Home Warranty
American Home Shield – Home Warranty
3.5(
5,688
)
Above Ground Swimming Pool or Accessories - Repair or Service

Serving Georgetown, ID and surrounding areas

In business since 1971

Credit card accepted

"One oven doesn't work at all ( my choice, see above), the "working" oven was never calibrated properly so using it is hit or miss. It's time to call American Home Shield to see about replacing the entire unit. I'm waiting to finish other home projects before calling them. I don't know if I'll request Greenway again."
Additional Photos
Additional Photos
Additional Photos
Additional Photos
Additional Photos

+2

Recommended by65%of homeowners
Install Above Ground Pools questions, answered by experts

There are some companies that offer acid washes that do not require pool draining. However, the process can take several days and requires a bit more elbow grease to scrub the pool surface compared to draining it entirely. Since your pool surface and age are both a factor, work with a professional to choose the best method.

In most cases, late May or early June are the most popular times to open a pool, depending on your location. It’s a good idea to open your pool when the outdoor temperature sits consistently above 65 to 70 degrees (F). At this point, algae will begin to flourish in your water, so opening the pool and adding the proper chemicals will avoid excessive pool algae growth.

How long a pool liner lasts depends on the type of pool. Most in-ground pool liners last between six and 12 years, while aboveground pool liners last anywhere from six to 10 years. You can extend the life of your pool liner by maintaining proper pool chemistry, adding chemicals individually to avoid staining the liner, using a pool cover to protect it from the sun, and keeping sharp objects away from it.

The amount of time your fiberglass pool project will take depends on the size of the pool and whether you are installing add-ons like decking and landscaping. Overall, you should expect it to take four to six weeks to install. If you are dreaming of summer pool parties, make sure to budget enough time into the installation schedule to have your pool up and running in time for the swimming season.

Whether or not a pool needs a dedicated circuit depends on the electrical needs of the motor, lights, and pump. Keep in mind that pool motors can use a lot of electricity. A dedicated circuit can prevent the breaker from tripping whenever you use the pool. A small motor for an equally small pool may only need a GFCI outlet. It’s best to plug it directly into the outlet rather than using an extension cord. You should also consult an electrician to ensure your pool’s electrical system is in accordance with local regulations.

The Georgetown, ID homeowners’ guide to above ground pool installation services

From average costs to expert advice, get all the answers you need to get your job done.