Top-rated rototilling pros.

Get matched with top rototilling pros in Burley, ID

Enter your ZIP and get matched with up to 5 pros

Need a pro for your rototilling project in Burley, ID?

Select your specific project to find the pro for you.

Find Rototilling pros in Burley

Country Curb and Landscaping

Unknown
No reviews yet

Country Curb and Landscaping

Unknown
No reviews yet
29 years of experience

We are a full service landscaping and general construction company serving both Cassia and Minidoka counties. We are always available by appointment. We accept cash, check and all major credit cards.

We are a full service landscaping and general construction company serving both Cassia and Minidoka counties. We are always available by appointment. We accept cash, check and all major credit cards.




Rototilling questions, answered by experts

A perc test takes an average of around two hours, but it can range from one hour up to around six hours. Perc tests that require wider or deeper holes and those that require multiple holes dug throughout your property will take longer because there’s more excavation involved. The actual filling of the hole and monitoring to gauge the rate of percolation should take under an hour per hole.

It depends on the model of your pool. You’ll always have to level the topsoil, but most vinyl-lined pools require an additional 1- to 2-inch layer of sand to protect the liner. This way, when a foot kicks down to the bottom of your pool, it’s not scraping the liner against the hard ground. If your pool isn’t vinyl-lined, you can skip this step or add a layer of another base material, like decomposed granite. Always check your manufacturer’s instructions before you begin.

An aboveground pool should be level within 1 inch—and it starts to become unsafe after a couple of inches. Any slope will lead to an uneven distribution of water, which will put pressure on your pool’s structure, wearing down the pool liner. In certain cases, it could cause your pool to collapse. Even if you’re within a safe window, you may still notice that the water level is uneven.

Not typically. A paver patio drainage problem generally requires a landscaping fix that can include a drainage pipe or dry well capable of handling the amount of runoff in your yard.

Mobile homes need releveling every so often to maintain their structural integrity. Most mobile home manufacturers recommend releveling every three to five years. To keep the quality of your mobile home up for years and to avoid deterioration over time, proper maintenance is key.

The homeowners guide to home care is here

From average costs to expert advice, get all the answers you need to get your job done.