Top-rated lead testing and removal specialists.

Get matched with top lead testing and removal specialists in Marion, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your lead testing and removal project in Marion, IA?

Select your specific project to find the pro for you.

Find Lead testing and removal specialists in Marion

Avatar for Milledge Construction
Milledge Construction
5.0(
9
)

Serving Marion, IA and surrounding areas

Approved

Free estimates

Warranties offered

Credit card accepted

"Excellent. No problems and the work was very efficient and quick. They were in and out in just a couple hours and left no trace of a mess what so ever. Very pleased with the overall installation"
Radon mitigation system
Radon Detection & Reduction Project
Radon Detection & Reduction Project
Radon Detection & Reduction Project
Radon Detection & Reduction Project

+56

Response time1 day
51 neighbors recently requested a quote
Recommended by100%of homeowners
Lead Testing and Removal questions, answered by experts

When a surface that contains lead dust is disturbed, the dust can float about in the air for roughly an hour before settling again. Since you cannot see the dust, it is important always to wear protective gear when working with any materials that may contain lead paint and to keep children, pets, and others away from the area for as long as possible

Determining if your water main contains lead involves a few steps. First, check the age of your property, as homes built before the 1980s might have lead pipes. Contact your water utility company for information on your service line material. Then, you can hire a professional plumber to conduct an inspection or use a lead testing kit to analyze water from the main line.

While not all homes built before 1978 contain lead paint, enough do, so you’ll still want to test to be on the safe side. The federal government banned lead-based paint for homes in 1978, but your state may have banned lead before that time. Around 24% of homes built between 1960 and 1977 contained lead-based paint, while 87% of homes built before 1940 contained lead-based paint.

Avoid disturbing suspected lead-containing materials and follow professional guidance on sample collection.

A professional indoor air quality inspection takes anywhere from one to three hours, depending on the size of your home and the number of necessary samples. After the test, the specialist will discuss the findings, but you won’t get a full written report for 2 to 10 days, though you can ask your pro to expedite the process, if needed. 

The Marion, IA homeowners’ guide to lead testing and removal services

From average costs to expert advice, get all the answers you need to get your job done.