Top-rated concrete mudjacking pros.

Get matched with top concrete mudjacking pros in Greene, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your concrete mudjacking project in Greene, IA?

Select your specific project to find the pro for you.

Find Concrete mudjacking pros in Greene

Avatar for Thrasher, Inc.
Thrasher, Inc.
4.1(
176
)
Concrete - Injection Leveling - Mudjacking

Serving Greene, IA and surrounding areas

Approved

In business since 2014

Free estimates

Warranties offered

"Big shout out to Dil and Cruise for doing a splendid job . They were very courteous, patient enough to listen to my concerns and very friendly. The Job was to lift the concrete and seal the joint and cracks . Time will tell how well the seal will hold especially with colorodo weather but so far happy the result. Thank you Trasher."
Basement Waterproofing Before and After
Concrete Repair Before and After
Thrasher Services
Thrasher Services
Thrasher Services

+12

Response time2 days
875 neighbors recently requested a quote
Recommended by87%of homeowners
Concrete Mudjacking questions, answered by experts

There is no real alternative to underpinning, although mudjacking and polyjacking are other repair methods that can add support from underneath your foundation. Rather than placing supportive piers under your structure, these involve pumping a material under your slab to lift a sunken section back into its original position. Polyjacking, in particular, is sometimes a suitable solution for stabilization issues under slab foundations, but underpinning is often accepted as the best and most permanent solution.

Most projects take 1-3 hours, with immediate usability after completion.

Yes, expanding foam (also known as polyurethane foam) can lift concrete. This approach, called polyjacking, involves injecting the foam rather than concrete slurry to fill voids and raise the concrete slab back into place. It’s often faster and requires smaller drill holes than traditional mudjacking, though it may come at a higher cost. Some contractors also prefer polyjacking over mudjacking for more damaged and delicate slabs.

Mudjacking typically takes 24 to 72 hours (one to three days) to dry and cure completely before you can resume normal use. The total drying time can vary depending on the size of the project. Because the slurry mixture contains cement, it needs to harden fully to prevent the concrete slab from shifting under added weight. You should avoid walking on the concrete or placing heavy items like furniture or vehicles on the surface until it has fully set. Your concrete contractor can provide a precise timeline. As a point of comparison, if you opt for polyjacking, the polyurethane foam can dry in minutes, but it's recommended to wait about an hour before use.

Address drainage issues, avoid heavy loads, and seal cracks to prevent future settling.

The Greene, IA homeowners’ guide to concrete mudjacking services

From average costs to expert advice, get all the answers you need to get your job done.