Top-rated basement remodelers.

Get matched with top basement remodelers in Glidden, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Glidden, IA?

Select your specific project to find the pro for you.

Find Basement remodelers in Glidden

Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Glidden, IA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Smith Home Improvments
4.6(
5
)
Basement - Remodel

Serving Glidden, IA and surrounding areas

In business since 2000

Free estimates

Emergency services offered

"Mr. Smith was able to remove the base of the light fixture. While he was doing this he found a loose wire that was live, so he reattached all my wires properly. He was then able to reattach my pull chain and put the light back up. I was relieved that he fixed the wiring problem to prevent future safety issues. Wonderful work and thoughtful demeanor."
Additional Photos
Recommended by100%of homeowners
Avatar for Chet's AZ Construction
Chet's AZ Construction
5.0(
4
)
Basement - Remodel

Serving Glidden, IA and surrounding areas

In business since 1984

Free estimates

Emergency services offered

"They were very quick got right in and got right to work, did not stop till the job was completed, Owner was on site the whole time, were extrmly helpful in trying to decide what to work with and what materials were best for the job as well as cost effeciant, Will be using this company for all my remodeling jobs as well as updates in my home. Couldnt be happier"
Recommended by100%of homeowners
Showing 1-10 of 23
Basement Remodel questions, answered by experts

Yes, you can add a kitchenette to a basement. However, you’ll have to consider the costs associated with basement kitchenettes. If you’re starting from scratch in an unfinished basement, you’ll need to account for brand-new plumbing, electrical, flooring, and more in addition to the cost of the kitchenette. If you’re putting a kitchenette in an already finished basement equipped with plumbing and electrical, you’ll save considerable money.

Home improvements that increase value offer a high return on investment (ROI) and can enhance your quality of life. Upgrades to your home’s curb appeal often add the most value, with garage door replacement having one of the best ROIs at 93%. Other high-value exterior projects include replacing your front door, upgrading siding and roofing, installing a stone veneer, adding new windows, and landscaping. For interior renovations, a fresh coat of paint provides an excellent ROI. Major projects like a kitchen remodel or upgrading appliances and HVAC systems also add significant value, as potential buyers appreciate the peace of mind that new equipment provides.

The time it takes to finish or remodel a basement can vary significantly, ranging from a few weeks to several months or even up to a year. On average, the construction phase can take four to eight weeks, but the total project time can extend to three or four months when including planning and permits. The timeline depends on several factors, including the basement's size, design complexity, the scope of the work, and your contractor's availability. A more detailed breakdown for an average-sized basement might include: framing (3-5 days), electrical and rough-in plumbing (3-5 days), drywall installation (5 days), flooring (2-3 days), and final touches like painting and trim (about a week). If preliminary work like installing a waterproofing system or addressing structural issues is needed, the timeline could extend to six to twelve months. Factors like difficult access, material transport, and ventilation needs can also add to the project's duration.

Permits may be required for major repairs, structural work, or electrical and plumbing restoration after a flood. Check with your local building department to determine permit requirements and associated fees for your flooded basement cleanup project. Obtaining the correct permits helps ensure work is done safely and up to code.

Kitchens and bathrooms are typically the most expensive rooms to renovate. The high cost is due to several factors, including expensive appliances like ranges, hoods, and refrigerators, as well as costly fixtures. The 'bones' of the room, such as electrical and plumbing, are also expensive to move or replace. Because of the vast amount of prep work, finishing, and specialized labor involved in a relatively small footprint, these projects can cost double or more than a living space remodel. Even when trying to renovate on a budget, kitchens and bathrooms will likely carry a hefty price tag.

The Glidden, IA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.