Top-rated basement remodelers.

Get matched with top basement remodelers in Doon, IA

Enter your zip and get matched with up to 5 pros

Need a pro for your basement remodel project in Doon, IA?

Select your specific project to find the pro for you.

Find Basement remodelers in Doon

Avatar for Dave's Creative Construction LLC
Dave's Creative Construction LLC
5.0(
4
)
Basement - Remodel

Serving Doon, IA and surrounding areas

In business since 2005

Free estimates

Warranties offered

"One of the best guys in his field. He has done a lot of quality or through our property. Really appreciate his promptness and professionalism. We still continue to hire him. Thanks David!"
Bathroom remodel
Bathroom remodel
Bathroom remodel
Home remodel
Home remodel

+15

Response time2 days
Response rate100%
Avatar for Homemade Design
Homemade Design
3.7(
322
)
Basement - Remodel

Serving Doon, IA and surrounding areas

In business since 2006

Credit card accepted

"Amanda was really very good!  At first I was very skeptical, thinking why did I pay money to just speak with someone on the phone about my kitchen remodel project... but after just a few minutes of her addressing some of the issues/questions I emailed to her earlier, I knew it was worth it.  It was very clear that she knew her business and she gave me several ideas that I had not even thought about.  I told her that I would definitely recommend her to friends and I will very likely use her again myself for my next home project!

"
Pennsylvania Master Bathroom
Boston Small Condo Kitchen
California Client Saves with HMD Designer Discounts
Recommended by54%of homeowners
Avatar for The Plumbing Company
The Plumbing Company
4.5(
23
)
Basement - Remodel

Serving Doon, IA and surrounding areas

In business since 2011

Free estimates

Small jobs welcome

"Have worked with Caleb on remodel of guest bathroom. Doing Master bathroom this time. Waiting for shower removal and new installation till August. Bathroom Co. scheduled a painter they had not used before. I would caution them about using Precision Painting. My one concern is that they do not wait the recommended 4 hours before applying the second coat. Otherwise, painters were careful, did cleanup perfectly."
Brushed Nickel Curved Shower Rod
Marble mosaic tile floor
Marble mosaic tile floor
Marble subway tile tube surround
Marble subway tile tube surround with accent

+3

Response time1 day
Response rate88%
Recommended by90%of homeowners
Avatar for JP Contracting LLC
JP Contracting LLC
3.0(
2
)
Basement - Remodel

Serving Doon, IA and surrounding areas

In business since 2021

Free estimates

Credit card accepted

JP Contracting is a newly formed company with the principles in the business having over 20 years experience in the construction industry. We got tired of being the point of contact for our customers and keeping secrets we do everything open book. \n\nWe specialize in new home construction, large and small remodels (I.e. kitchen, bath, home additions) \n\nWe take care of everything from local permitting to material acquisition to completion. Keeping the client informed along the way.

Recommended by100%of homeowners
Showing 1-10 of 14
Basement Remodel questions, answered by experts

Efficient appliance positioning, optimizing existing plumbing, and sourcing energy-efficient materials reduce financial impact and increase sustainability.

Framing a basement takes three to five days, on average, when completed by a professional, though it may take longer for a larger space. Keep in mind this doesn’t include the time to complete the design, obtain permits, and install the drywall on the framing. On average, fully finishing a basement takes an average of 45 days.

Walkout basements are not generally included in a home’s square footage, although they may be if they meet certain conditions that depend on local regulations. A finished walkout basement used as a living space may be counted toward square footage in some locations as long as all codes for livable space are met.

A finished basement must have a heat and electrical supply with an entrance that meets building code requirements, such as a stairwell to the home's main living space. It often must include finished walls, ceilings, and floors. If the finished basement includes a bedroom, it should have a heat source, an egress window, and a closet.

Remodeling, as opposed to finishing, means altering an already finished basement by adding a bathroom, bedroom, or living area.

Common mistakes when finishing basement walls include neglecting proper insulation, insufficient moisture management, and poor ventilation. Not addressing these issues can lead to mold growth, water damage, and discomfort. Additionally, inadequate planning, improper framing, and rushing the project can result in subpar outcomes. 

It's essential to follow best practices, seek professional guidance if needed, and prioritize thoroughness and attention to detail.

The Doon, IA homeowners’ guide to basement remodels

From average costs to expert advice, get all the answers you need to get your job done.