Top-rated asphalt driveway pros.

Get matched with top asphalt driveway pros in Haiku, HI

Enter your ZIP and get matched with up to 5 pros

Need a pro for your asphalt driveway service project in Haiku, HI?

Select your specific project to find the pro for you.

Find Asphalt driveway pros in Haiku


Avatar for Warmzone

Warmzone

4.00(
3
)

Warmzone

4.00(
3
)
Customers say: Quick response
22 years of experience

WARMZONE is a national company designs and sells radiant snow removal systems for heated driveways and walkways, radiant floor heating and roof deicing. We have a trained staff of professionals that will learn about your project requirements and perscribe the best solution possible to heat your driveway or home. We have a network of subcontractors across the United States. Our consultations and designs are free and we have one of the largest selection of proven products to choose from. Call or email us to receive a free quote.

"They were absolutely wonderful. Will sure recommend them"

Jorge D on April 2018

WARMZONE is a national company designs and sells radiant snow removal systems for heated driveways and walkways, radiant floor heating and roof deicing. We have a trained staff of professionals that will learn about your project requirements and perscribe the best solution possible to heat your driveway or home. We have a network of subcontractors across the United States. Our consultations and designs are free and we have one of the largest selection of proven products to choose from. Call or email us to receive a free quote.

"They were absolutely wonderful. Will sure recommend them"

Jorge D on April 2018

Asphalt Driveways questions, answered by experts

Give your driveway at least 24 to 48 hours to dry. After 72 hours, you can walk or park on it, but tread lightly. It might look solid, but it’s still soft and can be easily damaged. It can take 30 days to a year for an asphalt driveway to fully cure, so avoid parking extremely heavy vehicles on it. For the best results, always check with your contractor for their advice. Different mixes and weather conditions can affect curing times, so it’s worth waiting longer if it means a driveway that lasts.

Concrete is often the default material for a driveway apron, and many local building codes may require this. If you’re not restricted to concrete, however, you can consider alternative driveway apron ideas, such as asphalt, pavers, or gravel. You can also stamp the concrete for an interesting texture, add color to the concrete for a little extra character, or add a swirled trowel finish to your concrete driveway apron.

Unlike drying, which takes between 48 and 72 hours on average, asphalt driveway cure times are different and take much longer. Your asphalt driveway won’t actually cure for around six months to one year. During this time, it’s more likely to get damaged or weakened by heavy machinery, vehicles, and high temperatures. 

Asphalt is not a type of concrete. While both are a common type of pavement, asphalt is composed of aggregates (like sand and gravel) and bitumen; concrete is a mixture of cement, aggregates, and water. Here are some of the key differences between asphalt and concrete driveways.

If your driveway is cracked, you can repave it with a process called asphalt overlay. Overlay is more cost-effective than a full replacement but is better suited for minor cracks and issues. If you have major cracks or other problems like water pooling, asphalt overlay isn’t your best bet. Plus, paving over a cracked driveway only extends the lifetime by about 10 years, whereas replacing it would start the clock over completely to give you up to 30 years.

The Haiku, HI homeowners’ guide to asphalt driveway services

From average costs to expert advice, get all the answers you need to get your job done.